My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03360
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:03 PM
Creation date
10/4/2006 11:40:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Elbert
Stream Name
Kiowa Creek
Basin
South Platte
Title
Floodplain Information Report
Date
1/1/1976
Prepared For
Elbert County
Prepared By
United Western Engineers
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />such lower rate shall become effective as of!the date the higher rate was <br />placed in effect on an interim basis by the ~ssistant Secretary, and the <br />amount of the refund will be the overpayment!on all transactions, that is, <br />the difference between the amount paid for t~e transaction and the amount <br />that would have been paid under the Substitute Rate, unless the FERC deter- <br />mines that there will be no refund because the administrative cost of a <br />refund would exceed the amount to be refunded. In the case covered by the <br />proviso in Subsection (d) the amount of the refund is determined by the <br />FERC. In both cases, the amount of interest' on the refund will be <br />determined by the FERC. <br /> <br />, <br />(g) A rate confirmed and approved by ~he FERC on a final basis shall <br />remain in effect for such period or periods as the FERC may provide or until <br />the Assistant Secretary places a new Provisibnal Rate into effect; Provided, <br />That the Assistant Secretary may extend the rate on an interim basis beyond <br />the period specified by the FERC as provided in Section 903.23. <br /> <br />Section 903.23 - Rate Extensions <br /> <br />. <br /> <br />(a) The following regulations shall ~pply to the extension of rates <br />which were previously confirmed and approve~ by the FERC, the Federal Power <br />Commission or the Administrator of the Econqmic Regulatory Administration, <br />or established by the Secretary of the Inte~ior: <br />I <br />(1) The Administrator shall giv~ Notice of the proposed <br />extension at least 30 days before the expiration of the prior confirmation <br />and approval, except that such period may be shortened for good cause shown. <br /> <br />(2) The Administrator shall allow for consultation and comment, <br />as provided in Section 903.14, for such period as he or she may provide. <br />One or more public information and comment fforum(s) may be held, as provided <br />in Sections 903.15 and 903.16, at such time~S) and location(s) and with such <br />advance notice as the Administrator may provide. <br />, <br />! <br />(3) Following the conclusion of:the consultation and comment <br />period, the Assistant Secretary may extend the rates on an interim basis. <br />Such extension shall be governed by Sections 903.21(d) and 903.22. <br /> <br />(b) Provisional Rates may be extende~ by the Assistant Secretary <br />without advance notice or comment. The Assistant Secretary shall publish <br />notice in the Federal Register of such exte~ision and shall promptly advise <br />the FERC of the extens10n. I <br /> <br />. <br /> <br />. <br /> <br />62 <br /> <br />., <br />
The URL can be used to link to this page
Your browser does not support the video tag.