My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03360
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:03 PM
Creation date
10/4/2006 11:40:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Elbert
Stream Name
Kiowa Creek
Basin
South Platte
Title
Floodplain Information Report
Date
1/1/1976
Prepared For
Elbert County
Prepared By
United Western Engineers
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />(4) "Proposed Substitute Rate" ml;ans a proposed substitute for a <br />Provisional Rate that has been disapproved by the FERC on which, in the <br />Administrator's judgment, further public comment should be invited. <br />(5) "Substitute Rate" means a rate submitted by the Assistant <br />Secretary to the FERC as a proposed substitute for a Provisional Rate or a <br />previous Substitute Rate that has been disapproved by the FERC. <br /> <br />Section 903.11 - Advance Announcement of Rate Adjustment <br /> <br />The Administrator may announce that the development of rates for a new <br />service or revised rates for an existing service is under consideration. <br />The announcement shall (1) specify the rates' whi ch are to be developed or <br />revised, and (2) contain any other pertinent information relevant to the <br />rate adjustment process. The announcement may be through direct contact <br />with customers, at public meetings, by press; release, by newspaper <br />advertisement, and/or Federal Register publiication. Written comments <br />relevant to rate policy and design and to the rate adjustment process may be <br />submitted by interested parties in responseito the announcement. Any <br />comments received shall be considered in thS development of Proposed Rates. <br /> <br />Section 903.13 - Notice of Proposed Rates <br /> <br />(a) The Administrator shall give Notice that Proposed Rates have been <br />prepared and are under consideration. The Notice shall include: <br /> <br />(1) The Proposed Rates; <br /> <br />(2) An explanation of the need for' and derivation of the <br />Proposed Rates; <br /> <br />(3) The location(s) at which data, studies, reports or other <br />documents used in developing the Proposed Rates are available for inspection <br />and/or copying; <br /> <br />i <br />(4) The date(s), time(s), and l;ocation(s) of any initially <br />scheduled public information and comment forum(s); and <br />, <br />(5) Addresses to which written!comments relative to the Proposed <br />Rates may be submitted. <br /> <br />(b) Upon request, customers of the power system and other interested <br />persons will be provided with copies of the principal documents used in <br />developing the Proposed Rates. . <br /> <br />Section 903.14 - Consultation and Comment Period <br /> <br />All interested persons will have theiopportunity to consult with and <br />obtain information from the PMA, to examine backup data, and to make sug- <br />gestions for modification of the Proposed Rates for a period ending (1) 90 <br />days, in the case of major rate adjustments, or 30 days in the case of minor <br /> <br />. <br /> <br />58 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.