My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03360
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:03 PM
Creation date
10/4/2006 11:40:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Elbert
Stream Name
Kiowa Creek
Basin
South Platte
Title
Floodplain Information Report
Date
1/1/1976
Prepared For
Elbert County
Prepared By
United Western Engineers
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />initial regulatory flexibility analysis to describe the impact of the <br />proposed rule on small entities. In this instance, the rate adjustment for <br />the CRSP relates to non~regulatory services provided by Western at a <br />particular rate. Under 5 U.S.C. 601(2), rates or services of particular <br />applicability are not considered "rules" within the meaning of the Act. <br />Since the rate for CRSP power is of limited applicability and is being set <br />in accordance with specific regulations and legislation under particular <br />circumstances, Western believes that no flexibility analysis is required. <br /> <br />. <br /> <br />XII. PROCEDURES FOR PUBLIC PARTICIPATION IN POWER AND TRANSMISSION RATE <br />ADJUSTMENTS <br />Procedures for Public Participation in power and transmission rate <br />adjustments have been published in the Code of Federal Refiulations at 10 CFR <br />part 903. Corrections and amendments theretO-were pUOllS ed ln the January 22, <br />1981, Federal Register (46 FR 6864-6865) and in the May 7, 1981, Federal <br />Register (46 FR 25426-25427). A copy of 10 CFR part 903, as corrected and <br />amended, follows. <br /> <br />~ <br /> <br />- <br /> <br />10 CFR PART 903 <br />Section 903.1 - Purpose and Scope; Application <br />Section 903.2 - Oefinitions <br />Section 903.11 - Advance Announcement of Rate Adjustment <br />Section 903.13 - Notice of Proposed Rates <br />Section 903.14 - Consultation and Comment Period <br />Section 903.15 - Public Information Forum(s) <br />Section 903. 16 ~ Public Comment Forum(s) <br />Section 903. 17 ~ Revised Proposed Rates <br />Section 903.21 - Provisional Rates <br />.Section 903.22 - Final Rate Approval <br />Section 903.23 - Rate Extensions <br /> <br />Authority: Sections 30l(b), 302(a), and 644 of Department of Energy <br />Organization Act Public Law 95~91, (42 U.S.C. 7101 et ~); Section 5 of the <br />Flood Control Act of 1944 (16 U.S.C. 825s); the Reclamation Act of 1902 (43 <br />U.S.C. 372 et ~), as amended, particularly Section 9 (c) of the <br />Reclamation-,rrOJect Act of 1939 (43 U.S.C. 485h(c)); and the acts <br />specifically applicable to individual projects or power systems. Source: <br />45 FR 86983, Dec. 31, 1980, unless otherwise noted. <br /> <br />Part 903 - POWER ANO TRANSMISSION RATES <br /> <br />. <br /> <br />Subpart A - <br /> <br />Procedures far Public Participation in Power and Trans- <br />mission Rate Adjustments and Extensions for the Alaska, <br />Southeastern, Southwestern, and Western Area Power <br />Administrations. <br /> <br />Section 903.1 - Purpose and Scope; Application <br /> <br />(a) These regulations establish procedures for the development, and <br />for the confirmation and approval on an interim basis. by the Assistant <br />Secretary for Conservation and Renewable Energy, of new, revised, or <br />extended power and transmission. rates of the Alaska Power Administration, <br />the Southeastern Power Administration, the Southwestern Power <br /> <br />55 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.