My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03331
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:58 PM
Creation date
10/4/2006 11:40:05 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Basin
Gunnison
Title
Uncompahgre Valley Reclamation Project - Hydropower - Part 3 - Environmental Impact Statement DRAFT
Date
4/19/1989
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER 1 <br /> <br />PURPOSE AND NEED <br /> <br />Wild and Scenic Rivers Act <br /> <br />Section 5(a) of the Wild.and Scenic Rivers Act identified the <br />Gunnison River as a "Candidate River" for designation (Public <br />Law 93-621; January 3, 1975). The NPS completed a study and <br />concluded that 26 miles of the river from the upstream boundary <br />of the Black Canyon of the Gunnison National Monument downstream <br />to the Smith Fork confluence are eligible for designation as a <br />wild river. The eligibility was based upon five criteria: <br />(1) it is free-flowing; (2) its length is sufficient to provide a <br />meaningful experience to the recreation users; (3) it has <br />adequate volumes of high quality water; (4) its watershed and <br />shoreline are primitive and relatively inaccessible; and (5) its <br />environs possess outstanding scenic, geologic, recreational, and. <br />wildlife values (NPS, 1979b). <br /> <br />Development of any of the proposed alternatives would primarily <br />affect criterion 5, recreation use, and criterion 3, volume of <br />water, as discussed in detail in chapter 3. The river would <br />remain eligible for "wild and scenic" status under all <br />alternatives. <br /> <br />Wilderness Areas <br /> <br />Both a wilderness area and a wilderness study area exist along <br />the Gunnison River downstream from the Gunnison Tunnel. An area <br />of 11,180 acres in the Black Canyon of the Gunnison National <br />Monument has been designated as a wilderness, and 21,038 acres of <br />public land managed by the BLM downstream from the monument have <br />been designated the Gunnison Gorge Wilderness Study Area. <br /> <br />Operation of alternative hydropower plans would affect river <br />flows through these areas and this in turn would affect <br />recreation use. These impacts are discussed in chapter 3. <br /> <br />Black Canyon of the Gunnison National Monument <br /> <br />The ,Black Canyon of the Gunnison National Monument was <br />established in 1933 and borders the Gunnison River immediately <br />downstream from the Gunnison Tunnel. River flows through the <br />monument are regulated by the upstream Aspinall Unit Reservoirs <br />and by diversions through the Gunnison Tunnel. Alternatives <br />being considered under the project would further alter these <br />flows. The flow changes and their effects are discussed in <br />chapter 3. <br /> <br />1 -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.