Laserfiche WebLink
<br />SUMMARY <br /> <br />The purpose of this environmental impact statement is to present <br />the environmental impacts that would occur if any of the <br />alternatives of the AB Lateral Hydropower Facility were <br />constructed and operated. The facility would be funded, built, <br />and operated by the Uncompahgre Valley Water Users Association <br />(UVWUA) and Montrose Partners (referred to as the "Sponsors"). <br />These groups plan to construct the facility using existing <br />features of the uncompahgre Valley Reclamation Project (UVRP), a <br />Bureau of Reclamation (Reclamation) irrigation project. They are <br />seeking a lease of power privilege (contract) with Reclamation <br />that would permit using facilities of the UVRP. Hydropower <br />development in association with the UVRP was authorized by the <br />Act of June 22, 1938 (Public Law 76-698, Stat. 941). <br /> <br />The purpose of the facility, located in Montrose County, <br />Colorado, is to economically develop the energy potential of <br />water flows from the Gunnison River through the Gunnison Tunnel <br />to the Uncompahgre River. The large difference in elevations <br />between the Gunnison Tunnel and'the Uncompahgre River creates the <br />potential for hydropower production. Power from the proposed <br />facility would be sold to local utilities; for the first 15 years <br />of project operation, capacity and energy would be sold to the <br />Public Service Company of Colorado. After that period, a <br />different power sales agreement would be arranged. <br /> <br />The developers cite the following needs for the proposed <br />hydropower facility: (1)' generating electrical power; <br />(2) developing a renewable resource; (3) improving the existing <br />irrigation system of the UVRP; and (4) enhancing the UVWUA's <br />revenues for debt retirement and system improvement. <br /> <br />Alternatives <br /> <br />The alternatives in the environmental impact statement involve <br />generating hydroelectric power using flows diverted from the <br />Gunnison River and the elevation difference between the West <br />Portal of the Gunnison Tunnel and the Uncompahgre River in <br />Montrose~ A portion of the flows that would be diverted would <br />also be used to meet UVRP irrigation needs; the remaining flows <br />would be diverted for power generation. Four economically <br />feasible alternatives (designated alternatives B, C, E, and F) <br />are presented in the environmental statement along with <br />descriptions of plans that were studied but found infeasible. <br />Alternative A is the no-action alternative. <br /> <br />S - 1 <br />