Laserfiche WebLink
<br />summary Taple 2.--Summary comparison o( alternatives <br /> <br />Ite~ <br /> <br />tJ,o. ' <br />Cl"""H."t.S)........ ~. <br />I ~ A <br /> <br />B <br /> <br />Alte~~li8- <br />~(~ C I <br /> <br />E <br /> <br />F <br /> <br />CIl <br /> <br />WATER FLOW DATA (1n ftl/s) <br />Gunnison River; <br />Enterinq canyon (average annual) <br />Averaqe_peee~r through February {lows <br />Average July through september flows <br />Minimum flows <br />Below Delta (all pe:;iod:;,) <br />~Uneompahqre River; <br />Below south can'll (aver<tge annual) <br />Average December through February flows <br />Average July through sept9lf1ber flows <br />Below "ontroae . Delta Canal (average annual) <br />-Average December through February flows <br />Average July through september flows <br />Entering Montrose (average annua~) <br />Average December through February flows <br />Average July through September flows <br />B$low Cedar Creek (average annual) <br />Average December th,rough Februa.(f flows <br />AverAge July through september flows <br />Through turbines (average annual) <br />Average December through February 'flow. <br />Average, JUly through september flows <br />PRODUCTION DATA <br />Rated capaclty (lIP) <br />Average annual energy production (HWh) <br />Design flow capacity (ftl/s) <br />Net head at maximum capacity (feet, <br />PHYSICAL DATA <br />Pipoline diameter (inches) <br />TUnn~l modifications <br /> <br />..... <br />"" <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I No cha.n~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br /> <br />1.103 <br />1..392 <br />897 <br />300 <br /> <br />540 <br />89 <br />910 <br />312 <br />61 <br />471' <br />269 <br />50 <br />392 <br />202 <br />40 <br />279 <br />-NA- <br />-NA- <br />-NA- <br /> <br />-NA- <br />-NA- <br />-NA- <br />-NA- <br /> <br />-NA- <br /> <br />None <br /> <br />I <br />I <br />613 I <br />476 I <br />730 I <br />300 I <br />No change , <br />I <br />342 I <br />88 I <br />579 I <br />113 I <br />60 I <br />140 I <br />65 I <br />48 I <br />58 1 <br />684 I <br />956 I <br />'442 I <br />702 I <br />918 I <br />527 I <br />I <br />66,240 I <br />261,006 I <br />1,135 "I <br />580 I <br />I <br />120 I <br />None I <br /> <br />563 <br />471 <br />637 <br />300 <br />No chanqe <br /> <br />342 <br />88 <br />579 <br />113 <br />60 ' <br />140 <br />65 <br />48 <br />58 <br />735 <br />960 <br />536 <br />751 <br />922 <br />621 I <br />,1 <br />66.240 I <br />274,911 I <br />1,135 I <br />580 I <br />I <br />120 I <br />Enlarged I <br /> <br />I <br />I. <br />654 I <br />581 I <br />130 I <br />300 I <br />lio change I <br />I <br />342 I <br />88 I <br />579 I <br />113 I <br />60 I <br />140 I <br />65 I <br />48 I <br />58 I <br />643 I <br />850 I <br />442 I <br />661 I <br />812 I <br />527 I <br />1 <br />54,650 I <br />247.264 I <br />950 I <br />603 I <br />I <br />114 I <br />None I <br /> <br />618 <br />499 <br />730 <br />300' <br />No change <br /> <br />343 <br />88 <br />585 <br />115 <br />60 <br />145 <br />67 <br />48 <br />63 <br />679 <br />932 <br />442 <br />695 <br />894 <br />522 <br /> <br />66,240 <br />258.619 <br />1,135 <br />580 <br /> <br />120 <br /> <br />None <br /> <br />.1 The minimum flow for Alternative F would be increased as necessary during- winter months tor purging ice ~ildup 1n the <br />Gpnnison River downstream ot! the ':lunn.l. <br />I Penstock diameters are prel~nary and subject to qhange. <br />