Laserfiche WebLink
<br />.Z-;...<-- <br />7ZIb <br /> <br />FLOOD HAZARD MITIGATION <br />FEASIBILITY STUDY <br /> <br />STATE OF COLORADO <br /> <br />Q <br /> <br /> <br />Colorado Water Conservation Board <br />Oepdrtment of Natural Resources <br />I)" '"","',," >c-...,,, ~(J"," '" <br />:;"'..".Col""cto'mOJ <br />"",)00.,:1111"."',-.,.-:1 <br />FAX':'W!''''''"."" <br />'MW'.'-""-,""",",,"", <br /> <br />~':(.>.-"" <br />~'''''"'''' <br /> <br />FEASIBILITY STUDY REVIEW MEMO <br /> <br />C"'liE w,.,,, <br />""'",,.."'''',", <br /> <br />June 26, 1001 <br /> <br />',,o""""'" <br />~"c, ~.,,"" <br />O,,"MJ\~'" <br />o.oAyD.,,"'" <br /> <br />Rcport: City ojSluling, Pawnee Creek Flood Ha::ard Miligarion Feasihiliiy Study <br /> <br />con,ultant:lconEngineerip <br />R~viewer: Bill Grcen~ <br /> <br />1. The appendices should be rei~,~nced in the text ofth~ report with 'appendix numbers. <br /> <br />PAWNEE CREEK <br /> <br />1. ThcJuiy10 City of Sterling election on the project should be mcntioncd in the report <br />with results whenavailablc, <br /> <br />J. ThG de,criplion of the s~;ec:~d ~lte:;:~tive should be revised to correspond w,th the <br />results of the July lOeleelion and the City's final decision on the project. Revi~ed <br />design~ and cost eSllmates should bc provided. <br /> <br />Marrh2001 <br /> <br />City of Sterling <br />CentenoialSquare <br />421 North 4th Street <br />Sterling,COS075! <br /> <br />Colorado Water Conservation Board <br />1313 Sbennan Street <br />Room 721 <br />Deover,CO!<<l203 <br /> <br />Logan County <br />315 Main <br />Sterling. CO 807!i1 <br /> <br />4, The description of the financial program should be revised 10 rotlect the mostreeent <br />costestimme including the amount of funding to be contributed by each funding <br />sOl.lroe. (I umlerstand that FEMA may be able to contribute some additional funds to <br />the project.) The financial projection in Appendix 7 for the Capilallmprovement <br />Fl.lnd looks OK so long as the City is not intending to borrow more than th~ existing <br />51,160.000 authorization from the CWeB, <br /> <br />ICON Engineering, Inc <br />8100Soutb Akron Way <br />Suile300 <br />En~lewo()d. co 80112 <br />(303)221-0802 <br /> <br />5 fhenew design and cost estimate may require revisioJls to the econ omie <br />(benefit/cost) analysis. <br /> <br />6, Will the revise" dcsi.,'I\ require revislOns to thecnvironmcmal walyse s" <br /> <br />~ Wilt there \:Ie change~ to the design and constrllction schelink on ?age 46~ <br /> <br />3, 0;; pa;;;: -43, :t~ :~~: i,.di;:;;:;::; :r...: ~.,:i;;-,~:~d ~~cod Ga;;-,~;;~" W~,C b;;..,.:d o~ :;:.~.::\;.", <br />lllventoricdina 1<J83 report, Were structures bl.lilt since 19SJacco unledli.lr'; <br /> <br />9. l.:an't lind the reaches used lor damages on figllre 12 (mennonedon pagc.J.3l. <br /> <br />F1".".; p"~",,,... w,,"" P''''''c< "hM;"~ ,'"0 "n",,, "'" "'e,'.... .",,1 ...,. ""'"'''''' <br />'_'No'""";.,.,.,,,,",;;,", (""',~e.-.",,"P!,co,,., <br />