Laserfiche WebLink
<br />section (2) contains hydraulic information for t:he "Town of <br />Wiggins, Colorado Operation and Main'tenan,:e Manual", January <br />1989 ("Wiggins 0 & M Manual, 1989"). This section consists <br />of the primary hydraulic products reqwasted in 'the CWCB <br />Plan-of-Work (See Appendix B). It contains rating curves, <br />travel times, and the rela1:icmships betw,aen flooding at the <br />warning sites and at Wiggins" <br /> <br />section (3) details the flood warnin'9' obj ,actives. The method <br />by which flood warning time 1,vas defined, as well as 1:he use <br />of the flood warnings are discussed in this section. <br /> <br />section (4) describes the flood detection <br />section describes the "nuts and bol'ts" elf <br />mated flood detect,ion gage. <br /> <br />equipment. <br />building an <br /> <br />This <br />auto- <br /> <br />section (5) describes the opl~ra1:ion of au'tomated flood detec- <br />tion gages. This section provides detailed information on the <br />operation of a flood warninq ,rage and sugl3"estion~; on how the <br />information provided by the .,age can be used. <br /> <br />section (6) de,scribes the long term main'tenance and testing <br />that is require,d for both the automated and manual components <br />of the flood warning system. Details of how to service the <br />equipment and conduct routine drills are contained in this <br />section. <br /> <br />section <br />trict on <br />system. <br /> <br />(7) contains the recommendations of the Omaha Dis-' <br />the configuration and operation of the flood warning <br /> <br />Appendix A contains a discussion of the methodology <br />the hydrologic and hydraulic analyses conducted to <br />this report. <br /> <br />used in <br />develop <br /> <br />Appendix B cont:ains the corr"ilspondence that defined the scope <br />of work for this report. <br /> <br />1.5 Flood Warning Gage Locations <br />Two flood warning gage 10':atio!1s for the town of Wiggins <br />have been ident:ified. The upstream gage location is on the <br />downstream side of the Highway 52 bridge in the <br />SWlj4SElj4,Sec.5,~'lN,R61W in weld County, Colorado. The <br />downstream gagE' would be 10ca1:ed on the downstream side of a <br />County road bridge in the NWlj4SW1j4,Sec.31,T3N,H60W, at the <br />Weld - Morgan County Line. 'rhe locations of both gage sites <br />are shown in Figure 1. <br /> <br />2. REQUESTED HYDRAULIC PRODUC'rS <br />This section contains the ma'terial requested in 'the CWCB <br />document "State of Colorado Corps's section 22 Planning Pro- <br />gram, Plan-of-Hork". A copy of this document is contained in <br />Appendix B. <br /> <br />:2 <br />