Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />storage in the mountains, which may in turn lower flows to the significant <br />potentially impacted floodplain in the West Valley. <br /> <br />3. <br /> <br />Stream flow routing model improvements should be pursued in the main <br />stream below Gross and especially in the floodplains downstream of Eldorado <br />Canyon. <br /> <br />4. <br /> <br />The 500-year flood model should be reviewed to assure adequate <br />performance of the various flow splits. <br /> <br />5. <br /> <br />This new hydrology model should be considered a draft and subject to <br />further change even after being finalized as part of this scope of work. <br />Subsequent floodplain mapping, surveys, design of improvements may reveal <br />the need for refinements to reflect important splits, floodplain mapping and <br />dynamic storage characteristics, and other factors. <br /> <br /> <br />I - 16 <br /> <br />/'... <br />