My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03233
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:42 PM
Creation date
10/4/2006 11:33:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
El Paso County (Unincorporated Areas)
Stream Name
Sand Creek East Fork, Sand Creek East Fork Subtrib
Basin
Arkansas
Title
LOMR - Affected Panel 756F, 543F - Case No. 04-08-0062P
Date
11/18/2004
Prepared For
El Paso County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />., <br /> <br />Page 2 of 4 <br /> <br />I Issue Date: JUL <br /> <br />- <br /> <br />Ii <br /><>~ <br /> <br />.~) <br />'" ' 'I; <br />?l.: " <br />""" ($!; <br />~JvDstC; <br />- <br /> <br />2 3 2004 I Effective Date: NOV 1 8 2004 I Case No.: 04-0S-0062P <br /> <br />IlOMR-APP <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION <br /> <br />APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION <br /> <br />We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (pL. 93.234) and in accordance <br />with the National Flood Insurance Act of 1968, as amended (Title xm of the Housing and Urban Development Act of 1968, <br />P.L. 90-448), 42 U.S.c. 4001-4128, and 44 CFR Par! 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as <br />amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or <br />exceed NFIP criteria. These criteria, including adoption of the FIS report and FIRM, and the modifications made by this LOMR, are the <br />minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements <br />to which the regulations apply. <br /> <br />We provide the floodway designation to your community as a tool to regulate floodplain development. Therefore, the floodway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate <br />community action, as specified in Paragraph 60.3(d) of the NFIP regulations. <br /> <br />NFIP regulations Subparagraph 60.3(b)(7) requires communities to ensure that the flood-carrying capacity within the altered or relocated <br />portion of any watercourse is maintained. This provision is incorporated into your community's existing floodplain management <br />_ordinances;,therefore"responsibi1ity_for,maintenance,ofthe,modified,channel,and,culvert,rests,with,your,community.-We,may,request- <br />that your community submit a description and schedule of channel and culvert activities. <br /> <br />COMMUNITY REMINDERS <br /> <br />We based this determination on the I.percent-annual-chance flood discharges computed in the FIS for your community without <br />considering subsequent changes in watershed characteristics that could increase flood discharges. Future development of projects <br />upstream could cause increased flood discharges, which could cause increased flood hazards, A comprehensive restudy of your <br />community's flood hazards would consider the cumulative effects of development on flood discharges subsequent to the publication of <br />the FIS report for your community and could, therefore, establish greater flood hazards in this area. <br /> <br />Your community must regulate all proposed floodplain development and ensure that permits required by Federal andlor <br />State/Commonwealth law have been obtained. State/Commonwealth or community officials, based on knowledge oflocal conditions and <br />in the interest of safety, may set higher standards for construction or may limit development in floodplain areas. If your <br />State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take <br />precedence over the minimum NFIP requirements. <br /> <br />This determination is based on the flood data presenUyavailable. The enclosed documents provide additional information regarding this determination. If <br />you have any questions about this document. please contact the FEMA Map Assistance Center toll free at1.S77-336-2677 (1.877-FEMA MAP) or by letter <br />addressed to the LOMR Depot, 3601 Eisenhower Avenue. Alexandria, VA 22304. Additional information about the NFIP is available on our website at <br />htto"//www.fema.aov/nfio. <br /> <br />~e~ <br /> <br />Kevin C. Long, CFM. Project Engineer <br />Hazard Identification Section <br />Mitigation Division <br />Emeraencv PreDaredness and Resoonse Directorate <br /> <br />102426 D.A04080062 1021AC <br />
The URL can be used to link to this page
Your browser does not support the video tag.