Laserfiche WebLink
<br />EXHIBIT VIII-J, Cont. <br /> <br />2. Definitions <br /> <br />The following terms as used in this Contract are respectively defined as follows: <br /> <br />(a) CONTRACTOR: A person, firm or corporation with whom the contract is made by the <br />Owner, Le., the Local Public Agency. <br /> <br />(b) SUBCONTRACTOR: A person, firm or corporation suppiying labor and materials or only <br />labor for work at the site of the project, for and under separate contract or agreement with the Contractor. <br /> <br />(c) WORK ON (AT) THE PROJECT: Work to be performed at the location of the project, <br />including the transportation of materiais and supplies to or from the location of the project by employees of <br />the Contractor and any Subcontractor. <br /> <br />3. Additional Instructions and Detail Drawings <br /> <br />The Contractor will be furnished additional instructions and detail drawings as necessary to carry out the <br />work inciuded in the ccntracl. The additional drawings and instructions thus supplied to the Contractor will <br />coordinate with the Contract Documents and will be so prepared that they can be reasonably interpreted as <br />part thereof. The Contractor shall carry out the work in accordance with the additional detail drawings and <br />instructions. The Contractor and the Architect/Engineer will prepare jointiy: (a) a schedule, fixing the dates <br />at which special detail drawings will be required, such drawings, if any, to be furnished by the <br />ArchitecVEngineer in accordance with said schedule, and (b) a schedule fixing the respective dates for the <br />submission of shop drawings, the beginning of manufacture, testing and installation of materials, supplies <br />and equipment, and the ccmpletion of the various parts of the work; each such schedule to be subject to <br />change from time to time in acccrdance with the progress of the work. <br /> <br />4. Shop Setting Drawings <br /> <br />The Contractor shall submit promptly to the ArchitecVEngineer two copies of each shop or selling drawing <br />prepared in accordance with the scheduie predetermined aforesaid. After examination of such drawings by <br />the ArchitecVEngineer and the return thereof, the Contractor shall make such corrections to the drawings <br />as have been indicated and shall furnish the ArchitecVEngineer with two corrected copies. If requested by <br />the Architect/Engineer, the Contractor must furnish additional copies. <br /> <br />Regardless of corrections made in or approvai given to such drawings by the ArchitecVEngineer, the <br />Contractor will nevertheless be responsible for the accuracy of such drawings and for their ccnformity to the <br />Plans and Specifications, unless he notifies the ArchitecVEngineer in writing of any deviations at the time <br />he furnishes such drawings. <br /> <br />5. Materials, Services, and Facilities <br /> <br />(a) It is understood that except as otherwise specifically stated in the Contract Documents, the <br />Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, <br />transportation, superintendence, temporary ccnstruction of every nature whatsoever necessary to execute, <br />complete, and deliver the work within the specified time. <br /> <br />(b) Any work necessary to be performed after regular hours, on Sundays or Legal Holidays, <br />shall be performed without additional expenses to the Owner. <br /> <br />6, Contractor's Title to Materials <br /> <br />No materials or supplies for the work shall be purchased by the Contractor or by any Subcontractor subject <br />to any challel mortgage or under a conditional sale contract or other agreement by which an interest is <br />retained by the seller. The Contractor warrants that he has good litle to all materials and supplies used by <br />him in the work, free from all liens, claims, or encumbrances. <br /> <br />VIII-J-4 <br /> <br />(RevIsed 5/99) <br />