My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03190
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:34 PM
Creation date
10/4/2006 11:31:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Basin
South Platte
Title
Flood Mitigation Project - Schaefer Draw/South Platte Basin
Date
8/1/1996
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />l <br /> <br />Flood Hazard Mitigation Plan, Alternative 2 <br />Community of Weldona, Morgan County <br />Preliminary Cost Estimate <br />September 1997 <br />Item Unit Unit Cost Quantity Cost <br /> > <br />1. Channel capacity imp. along rail road CY $5 20000 $100,000 <br />2. New channel along CR 9 CY $5 18000 $90,000 <br />3. 3-sided box culverts at driveways EA $12,000 3 $36,000 <br />4. Warren Street improvements LS $100,000 1 $100,000 <br />5. Railroad bridge removal LS $2,000 1 $2,000 <br />6. R.OW. acquisition AC $5,000 5 $25,000 <br />7. Raise CR 9 and Hwy 144 LS $50,000 1 $50,000 <br />. 8. Construct ring levee at school property CY $3 5000 $15,000 <br />9. Culverts at Hwy 144 EA $10,000 2 $20,000 <br />10. Construct diversion dike CY $5 6000 $30,000 <br /> Subtotal $468,000 <br /> 20% Contingency $93,600 <br /> Subtotal Construction Cost $561,600 <br /> 10% Engineering Design $56,160 <br /> Total Project Cost $617,760 <br />
The URL can be used to link to this page
Your browser does not support the video tag.