My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03190
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:34 PM
Creation date
10/4/2006 11:31:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Basin
South Platte
Title
Flood Mitigation Project - Schaefer Draw/South Platte Basin
Date
8/1/1996
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />BID SCHEDULE <br /> <br />\, <br />\ <br />r o~\~. <br />\, .)1) <br /> <br />For <br />Topographic Mapping <br /> <br />For <br />the Community of Weldona (Morgan County, Colorado) and <br />the Town of Wiley (prowers County, Colorado) <br /> <br />Item <br /> <br />Article( s) of Service <br /> <br />Cost(s) <br /> <br />1. The proposed flight plan for the mapping areas at Weldona and Wiley <br />(project areas)including: <br /> <br />a. An approximate date and time of day the projects will be flown. <br /> <br />b. The flight height (above mean ground elevation). <br /> <br />c. A map showing ground control layout, flight lines, and <br />location(s) of permanent control markers. <br /> <br />d. <br /> <br />The cost of flying and photography. <br /> <br />$ <br /> <br />2. Establish vertical elevations and horizontal coordinates for <br />existing and permanent monuments located within the project areas <br />including the Contractor's control panels. <br />Permanent control marker identification tasks for vertical and <br />horizontal control: 1) set two (2) permanent control markers <br />for each project area and 2) panel any available U.S.O.S. and <br />N.O.S. benchmarks within the project area. The exact <br />number of markers to be set will depend upon the number of <br />acceptable existing markers that can be recovered by the <br />Contractor. Monuments shall be paneled prior to the aerial <br />photography. Provide one set of field notes for all ground control <br />and monument surveys. The cost ofthe ground control <br />survey shall be included in this item. Control can be obtained <br />by GPS survey procedures. $ <br /> <br />3. Provide two (I) set of black and white 9"x9" contact prints for <br />black and white aerial photo grapy $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.