My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03190
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:34 PM
Creation date
10/4/2006 11:31:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Basin
South Platte
Title
Flood Mitigation Project - Schaefer Draw/South Platte Basin
Date
8/1/1996
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br />.... <br /> <br />MEETING SUMMARY <br />Weldona Flood Hazard Mitigation <br /> <br />January 9, 1998 <br /> <br />Overview: <br /> <br />On Friday, January 9, 1998 a meeting and site visit were held in Weldona to discuss flood hazard <br />mitigation alternatives for the community. The CWCB met with interested parties to review <br />alternatives and come up with a recommended mitigation plan. <br /> <br />Meeting Attendees: <br /> <br /> <br />Mark Arndt <br />Joe Baltazar <br />Darrell Graham <br />Dick Earl <br />Kevin Kuretich <br />Tom Brownin <br />Dave Darlin <br />Ella R. <br />Bart Woodward <br />Rick Lorenzini <br /> <br />Key Results: <br /> <br />The following bullet items summarize the key results of the meeting and site visit: <br /> <br />· Based on input from County officials and other meeting attendees, the preferred mitigation <br />alternative consists of the following: <br /> <br />1. Construct a dike/channel system at the north end of town to protect Weldona from a <br />lOa-year flood event. The dike will begin at hwy 144 on the west end of town near CR <br />9, and will continue east and tie into to CR 9.5 near the high school. CR 9.5 will be <br />elevated from the point of the dike tie-in north to the first bend in the road. The <br />elevated road will act as a north-south levee to keep flows on the west side of the road. <br />2. Construct box culverts or a bridge under hwy 144 near CR 9. The opening of the <br />culverts or bridge should be 3 to 4 feet high and as wide as possible. Attempt to <br />construct the largest crossing possible for around $100,000. The lOa-year flows from <br />the dike/channel system will likely overtop the highway, and that is acceptable to <br />CDOT and the County. <br />3. Construct a lOa-year capacity channel downstream of the hwy 144 crossing. The <br />County would like to purchase the farm land south of hwy 144 and west of Grove <br />Street. The flood channel could go directly through this land to the South Platte River. <br />The County recommended that the railroad embankment be open-cut to save the cost of <br />
The URL can be used to link to this page
Your browser does not support the video tag.