My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03186
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:33 PM
Creation date
10/4/2006 11:30:49 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
All
Stream Name
All
Basin
Statewide
Title
Benefit-Cost Analysis of Hazard Mitigation Projects
Date
1/1/1996
Prepared For
FEMA
Prepared By
FEMA
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VERSION 1.0 1/12/95 <br /> <br />B-C PROGRAM: Level One Analysis <br /> <br />Rental Cost <br />During Occupant <br />Relocation <br /> <br />Other Relocation <br />Costs <br /> <br />Total Relocation <br />Costs <br /> <br />Total Mitigation <br />Project Costs <br /> <br />To Continue... <br /> <br />GREEN Block (Data Input). Rental Cost During Occupant <br />Relocation ($/sf/month) is an estimate of the rental rate paid for <br />temporary quarters. Major floods may cause extensive damage to <br />many structures, thus reducing the available supply of temporary space <br />and leading to higher rental costs throughout the area. <br /> <br />YELLOW Block (Result). Rentai Cost During Occupant Relocation <br />($/month) is calculated from the Rental Cost ($/sf/month) and the <br />Total Floor Area (sf). <br /> <br />GREEN Block (Data Input). Other Relocation Costs ($/month) <br />include moving and extra operating costs incurred because of the <br />temporary relocation. <br /> <br />YELLOW Block (Result). The Total Relocation Costs are calculated <br />from the entered Relocation Time Due to Project (months), Rental <br />Cost During Occupant Reiocation ($/month), and Other Relocation <br />Costs ($/month). <br /> <br />YELLOW Biock (Result). Totai Mitigation Project Costs are <br />calculated by summing the Mitigation Project Cost, the Present <br />Value of the Annual Maintenance Costs, and the Total Relocation <br />Costs. <br /> <br />This completes the LEVEL ONE (Minimum Data) Benefit-Cost <br />Analysis data entry process except for the Flood Hazard data. To <br />enter Fiood Hazard data, click on the Next Screen button at the bottom <br />of the second LEVEL ONE Data page, or select Flood Hazard from <br />the Benefit-Cost Program menu. <br /> <br />6-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.