Laserfiche WebLink
<br />I <br />I <br /> <br />_'____m___ <br /> I <br /> I <br />.Page I <br />66 I <br />67 <br />68 I <br />69 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> L <br /> ----------- <br /> <br />LIST OF FIGURES (continued) <br /> <br />I <br /> <br />I <br /> <br />Figure 23. Preliminary design - profile. <br />Figure 24. preliminary design - profile. <br />Figure 25. Preliminary design - profile. <br />Figure 26. TYpical improved channel cross section. <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />x <br /> <br />I <br /> <br />INTRODUCTION <br /> <br /> <br />Authority <br /> <br /> <br />This report was authorized and contracted through the City of Greeley, <br /> <br />Colorado (City) to develop preliminary designs for improvements to the Cache <br /> <br />1. <br /> <br />la Poudre River within the City. Simons, Li & Associates, Inc. (SLA) was <br /> <br />selected by the City as the Study COntractor according to the terms of the <br /> <br /> <br />agreement signed April 5, 1983. <br /> <br />Purpose and Scope of Work <br /> <br />This master floodway plan has been prepared to guide local officials in <br /> <br /> <br />planning the use and regulation of the Cache la Poudre River floodway within <br /> <br /> <br />and adjacent to the City. The master floodway plan is designed to minimize <br /> <br /> <br />flooding impacts within the floodway area. The purpose of a floodway is to <br /> <br /> <br />designate those areas to be kept free from future encroachment and reserve an <br /> <br /> <br />area for conveyance of the 100-year flood along the Cache la Poudre River. <br /> <br />The work for this study includes hydraulic analyses (including the veri- <br /> <br /> <br />fication of previous hydraulic analyses), development of alternative plans of <br /> <br /> <br />improvement, and preliminary design of the improvement alternative selected by <br /> <br />the City. Also included are analyses of river stability and sedimentation. <br /> <br /> <br />Floodway maps have been prepared and are available for review at the City of <br /> <br /> <br />Greeley Planning Department Offices. <br /> <br />Available Data and Previous Reports <br /> <br />Several reports have been prepared that contain information relevant to <br /> <br /> <br />this study. These are: <br /> <br />"Floodplain Information Study, Cache la Poudre River, Greeley, Colorado," <br />1971, prepared by the U. S. Army Corps of Engineers, Omaha District. <br /> <br />"Reconnaissance Report, Section 205, Cache la Poudre River, Greeley, <br />Colorado," 1981, prepared by the U.S. Army Corps of Engineers. <br /> <br />"Flood Insurance StUdy, City of Greeley, Colorado," 1979, prepared by the <br />Federal Insurance Administration. <br /> <br />"Flood Insurance Study, Weld COunty, Colorado," 1982, prepared by the <br />Federal Emergency Management Agency. <br />