Laserfiche WebLink
<br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />This report was prepared under the supervision and direction <br /> <br /> <br />undersigned, whose seal as a professional engineer is affixed. <br /> <br />I <br />I <br /> <br />EXECUTIVE SUMMARY <br /> <br />of the <br /> <br />I <br />I, <br /> <br />The City of Greeley (City) retained the engineering firm of Simons, <br /> <br /> <br />Li & Associates, Inc. (SLA) to conduct a master floodway plan for ~le reach of <br /> <br /> <br />the Cache la Poudre River within the City. The purpose of the master floodway <br /> <br /> <br />plan is to assist local officials in planning and regulation of the Cache la <br /> <br /> <br />Poudre floodplain and to minimize flooding problems within the City. The City <br /> <br /> <br />formed a Floodplain Panel to investigate the needs regarding the floodplain <br /> <br />and to p~ovide direction to the engineering consultant~ <br /> <br />Introduction <br /> <br />I <br />I <br /> <br /> <br /> <br />I <br /> <br />Wen-Sheng L <br />Vice President <br /> <br />Scope of Work <br /> <br /> <br />This study includes descriptions of the study area, hydraulic analysis <br /> <br /> <br />including verification of the flood insurance stUdy results, erosion and <br /> <br /> <br />sedimentation analysis, development of alternatives to reduce flooding <br /> <br /> <br />problems, evaluation of alternatives, and preliminary design of the recom- <br /> <br /> <br />mended alternative. <br /> <br />I <br /> <br />~",\\'llllllj/l!fl',1. <br />.,,:~:'1i} RFf."144~ <br />~.::.- ,-".,'"", """"'~'''~~.r~ <br />.:.( :':',,'-> . ..'.,:: '.' ";' l:'\':'~ & <br />.. '/iJ"~.r: 0::- <br />L, "...., '$G~~<::::O <br />,,:"_! ., ~ 0_, V"!':~' ~= <br />1'''\ ,-,r"', <br />:.~ pc';', _,_<.,; <br />~..~;:\~~ };:ej <br />..:;:',' ,\, ~'--~"'.",~ <br />-=;::. ." ..~,~ ...C<~.;.~-..,,~ <br />'-;:r.t,;,o",:_:'''t'e()'''~1'^\'~:,)~~ <br />....h.l~t:;:.. _ \,\" #- <br />.I~Jli_ ! , n, '~ .~\\\"\ <br />....'1/J1JJtJllii!\\\\\\\ <br /> <br />I <br />I <br />I <br />I <br /> <br />Hydraulic Analysis <br /> <br /> <br />Hydraulic analyses were performed to verify ~le results of the flood <br /> <br /> <br />insurance study for the City of Greeley. This study utilized the methodology <br /> <br /> <br />currently required by the Federal Emergency Management Agency. Topographic <br /> <br /> <br />mapping and river cross-section information from the previous flood study were <br /> <br /> <br />obtained from the Colorado Water Conservation Board and the City. The results <br /> <br /> <br />of the hydraulic analyses indicate that the previous study is reasonable. The <br /> <br /> <br />bridges at 8th Street, 5th Street and 6th Avenue are undersized and cause <br /> <br /> <br />backwater behind the bridges. The floodplain is very wide and generally <br /> <br /> <br />shallow. The floodway is wide in many locations preventing the development of <br /> <br /> <br />property adjacent to the river. <br /> <br />Erosion and sedimentation analyses were also performed. The Greeley <br /> <br /> <br />reach of the Cache la Poudre River is subject to excessive sedimentation <br /> <br /> <br />requiring dredging to clean out the channel. The river is subject to erosion <br /> <br /> <br />at bridge piers and at bends in the channel. <br /> <br />The following members of Simons, Li & Associates, ~nc. staff contributed <br />to the preparation of this report. <br /> <br />Project Manager <br />Project Engineer <br />Technician/Drafter <br />Technical Typist <br /> <br />Wen-Sheng Liang, Ph.D., P.E. <br /> <br />Thomas C. Fairley, P.E. <br /> <br /> <br />Michelle K. Beckfeld <br /> <br /> <br />Rebecca S. Chappelle <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />;,i <br /> <br />I <br /> <br />iii <br />