My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03160
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:29 PM
Creation date
10/4/2006 11:29:56 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
331
County
Mesa
Community
Grand Junction
Stream Name
Colorado River
Basin
Colorado Mainstem
Title
LOMR - Affected Panel 080117 0007 E, 080117 0009 E - Case No. 99-08-114P
Date
11/22/2000
Prepared For
Grand Junction
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3 <br /> <br />~. <br /> <br />The basis of this LOMR is, in whole or in part, a channel-modification project. NFIP regulations, as cited <br />in Paragraph 60.3(b )(7), require that communities ensure that the flood-canying capacity within the altered <br />or relocated portion of any watercourse is maintained. This provision is incorporated into your community's <br />existing floodplain management regulations. Consequently, the ultimate responsibility for maintenance of <br />the modified channel rests with your community. <br /> <br />This determination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448),42 U.S.C. 4001-4128, <br />and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as amended, <br />communities participating in the NFIP are required to adopt and enforce floodplain management regulations <br />that meet or exceed minimum NFIP criteria. These criteria are the minimum and do not supersede any State <br />or local requirements ofa more stringent nature. This includes adoption of the effective FIRM to which the <br />regulations apply and the modifications described in this LOMR. Our records show that your community <br />has met this requirement. <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community. The CCO will <br />be the primary liaison between your community and FEMA. For information regarding your CCO, please <br />contact: <br /> <br />Mr. Steve L. Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 710, Box 25267 <br />Denver, Colorado 80225-0267 <br />(303) 235-4830 <br /> <br />FEMA makes flood insurance available in participating communities; in addition, we encourage <br />communities to develop their own loss reduction and prevention programs. Through the Project <br />Impact: Building Disaster Resistant Communities initiative, launched by FEMA Director James Lee Witt <br />in 1997, we seek to focus the energy of businesses, citizens, and communities in the United States on the <br />importance of reducing their susceptibility to the impact of all natural disasters, including floods, hurricanes, <br />severe storms, earthquakes, and wildfires. Natural hazard mitigation is most effective when it is planned for <br />and implemented at the local level, by the entities who are most knowledgeable of local conditions and <br />whose economic stability and safety are at stake. For your information, we are enclosing a copy of a <br />pamphlet describing this nationwide initiative. For additional information on Project Impact, please visit <br />our Web site at www.fema.l!ov/impact. <br />
The URL can be used to link to this page
Your browser does not support the video tag.