|
<br />-
<br />
<br />TABLE 10.
<br />
<br />(Cont'<l)
<br />
<br />Cost
<br />Class Item
<br />
<br />09 Channels:
<br />Diversion ~ care of water
<br />Phreatophytc clearing
<br />Stripping
<br />Grass cover
<br />Excavation
<br />Flexible steel jetties
<br />Concrete
<br />Gravel
<br />Riprap
<br />Steel, reinforcing
<br />~anholes
<br />6"perforatcupipc
<br />Contingencies
<br />Total Channels
<br />
<br />11 L('v~"s:
<br />Pnreatophyte cIearing
<br />Stripping
<br />Elllbankmcnt,placil1g
<br />Service roads and ramps
<br />Interior drainage;
<br />Excavation, ditches
<br />Structures, levees:
<br />Bypass, Bent's Old Fort
<br />Concrete
<br />Gravel
<br />Steel, rdnforcing
<br />36" OlP in place
<br />42"(.."'-!Pinplace
<br />48"CMPinplace
<br />,6" sli~~ &"""5
<br />S'xS' slide gates
<br />3o"f1apgatcs
<br />42"flapgates
<br />4S"flapgatcs
<br />6':<4' flap gates
<br />5'xS' flap gates
<br />Structure>, crossings:
<br />Concrete
<br />Gravel
<br />Steel, reinforcing
<br />36" CMP in place
<br />41" CMPin phcc
<br />48"CMPinpJacc
<br />Contingencies
<br />Total Levees
<br />
<br />- - - - - - - - - - - - - . -
<br />
<br />Ouantitv
<br />
<br />2,240
<br />253,800
<br />5,040
<br />21,765,600
<br />117,200
<br />1,250
<br />3,800
<br />600
<br />435,000
<br />"
<br />5,200
<br />
<br />930
<br />129,800
<br />21,239,000
<br />
<br />5,357,400
<br />
<br />,
<br />1,366
<br />on
<br />139,100
<br />m
<br />22S
<br />3,225
<br />,
<br />,
<br />7
<br />3
<br />"
<br />,
<br />"
<br />
<br />1,872
<br />'"
<br />191,700
<br />22S
<br />450
<br />300
<br />
<br />I-lJ
<br />
<br />Unit
<br />
<br />Job
<br />Acre
<br />C.Y.
<br />Acre
<br />C.Y.
<br />Each
<br />C.Y.
<br />C.Y.
<br />C.Y.
<br />Ch.
<br />Each
<br />L.F.
<br />
<br />Acre
<br />C.Y.
<br />C.Y.
<br />Job
<br />
<br />C.Y.
<br />
<br />!:ach
<br />C.Y.
<br />C.Y.
<br />Ch.
<br />LoF.
<br />L.F.
<br />L.F.
<br />Each
<br />Each
<br />Each
<br />Each
<br />Each
<br />Each
<br />Each
<br />
<br />CY.
<br />C.Y.
<br />"'.
<br />L.F.
<br />L.I'.
<br />L.F.
<br />
<br />Unit
<br />Cost Total
<br />
<br />L.S.
<br />$56.00
<br />0.35
<br />15.00
<br />0.35
<br />50.00
<br />30.00
<br />4.00
<br />6.00
<br />0.15
<br />150.00
<br />1.80
<br />
<br />56.00
<br />0.35
<br />0.15
<br />L.S.
<br />
<br />0.35
<br />
<br />L.S.
<br />45.00
<br />.1.00
<br />0.15
<br />18.00
<br />22.00
<br />26.00
<br />~OO.OO
<br />2,800.00
<br />260.00
<br />350.00
<br />500.00
<br />1,100.00
<br />1,200.00
<br />
<br />4~.00
<br />4.00
<br />0.15
<br />18.00
<br />22.00
<br />26.00
<br />
<br />5200,000
<br />125,440
<br />88,830
<br />75,600
<br />7,617,960
<br />5,860,000
<br />217,500
<br />15,200
<br />3,600
<br />65,250
<br />1,800
<br />9,360
<br />2,842,460
<br />17,123,000
<br />
<br />52,080
<br />45,430
<br />3,335,850
<br />40,000
<br />
<br />1,875,090
<br />
<br />167,060
<br />61,470
<br />1,70S
<br />20,865
<br />12,150
<br />4,950
<br />83,850
<br />1,500
<br />14,000
<br />1,820
<br />1,050
<br />21,500
<br />4,400
<br />11,000
<br />
<br />84,240
<br />3,736
<br />18,755
<br />14,850
<br />9,900
<br />7,800
<br />1,lb7,1l46
<br />7,075,000
<br />
<br />,
<br />-
<br />I
<br />
<br />TASLElO.-_ (Cont'd
<br />
<br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br /> . . . . . . . . . . .
<br /> Cost Unit
<br /> Cla$s Item "'uantit Unit Cost Total
<br /> ;0 Engineorin~ JnJ Design $2,383,000
<br /> " Supervision anJ Administration 1,853,000
<br /> Subtotai 30,738,000
<br /> Less Non_FeJeral Share:
<br /> Fish ,.d Wildlife Facilities $491,000
<br /> Major Drainage 110,S50
<br /> Subtotal 601,850
<br /> i TOTAL FEDERAl. FIRST "'" 30,136,150
<br /> I
<br /> NON-FEDERAL FIRST COST
<br /> Lands and Damages:
<br /> Co, purchase:
<br /> Urban land " Acre 5,000.00 170,000
<br /> lrrigated land 77 Aere 650.00 50,050
<br /> Irrigated land ." Acre 600.00 534,000
<br /> Dryhrm land ';0 Acre 115.00 S6,2S0
<br /> River ,., J'"sture land 4,950 Acre 50.00 247,500
<br /> I Wasteland 4,780 Acre 15.00 71,700
<br /> Flowage casement 1,375 Acre 40.00 55,000
<br /> ImprovementS . Job L.S. 575,000
<br /> I Severance damages . Job L.S. 28,000
<br /> Contingencies 357,500
<br /> . Subtotal 2,145,000
<br /> ,
<br /> , Acquisitien Cost 214,500
<br /> , Contingencies
<br /> , 42,500
<br /> Subtotal 257,000
<br /> . Total Lands and Damages 2,~01,(lQO
<br /> Relocations:
<br /> Bridges:
<br /> , New highway bridges , Job L.S. 1,$%,000
<br /> , Bridge i:lodifications
<br /> I , Job L.S. 2,626,000
<br /> Road relocation 2,000 L.F. IS.OO 30,000
<br /> Irrigation diversion darns 12 Each L.S. 3,614,358
<br /> Fencing . ~ile 2,000.00 16,000
<br /> Contingencies 1,576,642
<br /> Total ~eloc"tioj\$ 9,458,000
<br />,
<br />I Or_f.nm J)"ainar.r_.;.<;Y..;:~ 2,470,()(l(l
<br /> l'u1"Chasc ._,r '""ll'r 4~,oon
<br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br /> . . . . . . . . . .
<br />
<br />L
<br />
<br />1-12
<br />
|