Laserfiche WebLink
<br />estimated to be $491,000_ Costs in connection with annual operation, <br />maintenance, and replacement of recreation and fish and wildlife <br />enhancement faciUhes, presently estlmated at $37,310, would be <br />apportioned entirely to non-Federal interests. Addltionalproject <br />costs to maintain the historic setting of Bent's Old Fort would be <br />apportioned to the Unlted States because of the special Federal <br />interest associated ~'ith the Kational Historic Site. <br /> <br />I <br />I <br />I <br />I <br /> <br />Arkansas River subbasin above John Martin Darn. Details of the economic <br />studies are included in Attachment V. A swnrnary of national and region_ <br />,,1 benefits by classes is given in Table 12. Project costs, apportion_ <br />ment of costs to Federal and non-Federal interests, and annual charges <br />are itemized in Table 13. <br /> <br />4g. The Arkansas Rlver Channelization Project, Pueblo to Las <br />Animas, would traverse Pueblo, Crowley, Otero, and Bent Counties. In <br />order to determine an equitable distribution of non-Federal costs to <br />each politieal subdivis~on, the first costs of constructlon were <br />estimated by counties and the urban areas of La Junta, as iteml:ed in <br />Table 11. Individual cash contributions, separable recreation costs, <br />and annual operation, maintenance and replacement eosts also are given <br />in Tahlc 11. <br /> <br />TABLEl!. <br /> <br />Distribution of Non-Federal Costs, Arkansas River <br />Channeli:ation,PucblotoLasAnil:las <br /> <br /> ~ , Annual <br />Count" Construetio Reerea. Ca.shCon- "''' <br />Lands etc. tion trihution Total Costs <br />Pueblo County $~,893,8SS 208,150 $26,930 $5,128,935 $174,355 <br />Crowley County 1,951,020 24,350 17,950 1,993,320 47,650 <br />OtcroCounty: <br />Urban (La JU<lta) 1,842,000 43,000 2,800 1,887,8O(J' 18,060 <br />Rural 6,374,325 215,500 63,110 6,652,995 181,155 <br />Subtotal 8,216,325 258,500 65,970 8,540,795 199,215 <br />Bent County &10,800 -- -- 610,800 13,590 <br />Total 15,672,000 491,000 110,850 16,273,850 434,810 <br /> <br />BEST PLAN OF IMPROVEMENT, ARKAIISAS RIVER AIID TRIBUTARIES ABOVE <br />JOHN !".ARTI!I DAM, COLO!II-.DO <br /> <br />49~ REANALYSIS OF PROJECT .'I)STIFICATIO.'l. ~ The local proteetlon <br />projects and the Arkansas River FlooJway from Drewster to florence, as <br />listed under 110DIFIED PLA~' OF INPROVEME,','T. were reanalyzed to deter"'lne <br />oconOlllic feasibility On the basis of January 1969 price levels and co ll_ <br />clitions, the interest rate of 4-7/8 percent, and utili:ation of the bene~ <br />fits >"hicll would be derived froT:lemploy",ent of the unemployed re sources <br />during and following project construction. All of the projects were <br />found to be economically justifiedunJer these criteria and are, the re- <br />fore, inCluded as elements of the revised plan of improvement for the <br /> <br />,. <br />., <br /> <br />'" <br />