Laserfiche WebLink
<br />'i <br /> <br />TABLE 7 _< toS! Allocation Studies, Separable Costs_Remaining <br />Benefits Method, Fountain Reservoir Project <br /> <br />TABLE7.-- (Cont'd) <br /> <br /> Flood , I <br /> Iten Control , Rccrention Total <br />l. Allocatlonof annual costs <br /> " Benehts $1,257,570 $732,000 $1,990,270 <br /> b. Alternate cost 1,552,000 1,225,000 - <br /> ,. Benefits liJllted by 1,257,570 732,700 1,990,270 <br /> alternate cost <br /> d. Separable cost 657,000 330,000 987,000 <br /> .. Remaining benefits 600,570 402,700 1,003,270 <br /> f. Allocated joint cost 535,750 359,250 895,000 <br /> g. Total allocation, 1,192,750 689,250 1,882,000 <br /> economic costs <br /> b. Total allocation; project l,ln,750 689,250 1,882,000 <br /> costs <br />,. AlIoeationof 0 " costs <br /> ", Separable cost 18,940 116,390 135,330 <br /> b, Allocated joint cost (in 47,200 31,650 78,850 <br /> proportion <0 1.<1.) <br /> ,. Total allocation, 0 &M 66,140 148,040 214,180 <br /> d. Specific costs 0 115,180 lIS,180 <br /> ,. Allocated joint-use costs 66,140 32,860 99,000 <br /> f. Ratio for allocation of .66808 .33192 1,0000 <br /> joint-useO&M <br />,. Allocation of major replacements .'13,070 <br /> ". Separable costs 5,590 27,480 <br /> b. Allocated joint cost (in <br /> proport:ion '" , ..) 8,550 5,730 14,280 <br /> ,. Tot:al Allocation, '" 14,140 I 33,210 47,350 <br /> d. Specific costs 0 , 27,000 27,000 <br /> e. Allocated joint-use cost 14,140 I 6,210 20,350 <br /> f Ratio for allocation of I <br /> joint-use replacement costs .69484 ,3.0516 1.0000 <br />,. Allocation of investment 1,620,470 <br /> ". Annual investmcntcost 1,112,470 508,000 <br /> b. A11ocat:ed investment 23,105,870 10,551,130 33,657,000 <br />s. Allocation of construction <br /> expenditures 0 3,951,000 3,951,000 <br /> ". Specific investment <br /> b. Investment in joint. uSe 23,105,870 6,600,1.30 20,706,000 <br /> facilities <br /> ,. Interest during construc- 976,930 279,070 1,256,000 <br /> tion on joint-use facilities <br /> d. Construction expenditures 22,128,940 6,.'121,060 28,450,000 <br /> in joint-use facilities <br /> <br /> Item FIOO,:" Recreation Total <br /> Control <br />s. Allocation of construction <br /> expenditures (Cont'd) <br /> e, I'ercentofconstruction 77.781 22.219 100.000 <br /> expenditures in joint. <br /> use facilities <br /> f. construction expenditures 0 $3,951,000 $3,951,000 <br /> in specific facilities <br /> g. Total construction <br /> cxpenditures $22,128,940 10,172,060 32,401,000 <br /> <br />36. APPORTIONMENT OF COSTS BeTWEEN IN1'ERf;'S'1S.- The first costs <br />for flood control ($27,990,000) would be borne by the Federal Govern~ <br />ment. The separable costs for recreation, fish and wildlife ($4,411,000) <br />would be apportioned equally between Federal and non-Federal interests <br />in accordance with provisions ef the F<1deral Water Project Recreation <br />~ct (P.L. 89_72). Costs in conncction with annual operation, mainte_ <br />nance, and replacement of recreation, fish and wildlife facilities, <br />presently estimated at 5142,180, would be apportioned entirely to non- <br />Federal interests. <br /> <br />37. PROPOSED REQUIREMENTS OF' LOCAL COOPERATION._ In the event <br />that the Fountain Rcservoir Project is authorizcd for construction by <br />the United States, local interests would be required to: <br /> <br />". <br />construction <br /> <br />1l01d and sav<, <br />and operation <br /> <br />the United States <br />of the project; <br /> <br />free from damages due to <br /> <br />b. Prevent encroachments on the channel of Fountain Creek <br />below the project and maintain a minimum capacity of 15,000 c.E.s.; <br /> <br />c. Acquire ~';lter rights .lnJ provtJ~ ~"ffi<.:ic,,~ w~tcr t<.> <br />establish and aSSUre maintenance of a recreation pool of 20,000 acre- <br />feet including losses due to evaporation, transpiration, and other <br />losses; <br /> <br />d. Pay, cOHtributeinkind,orrepay (which may be through <br />user fees) ~.ith interest, one-half of the separable first cost of the <br />project allocated to recreatIon and fish and wildlife enhancement. an <br />amount presently estimated at $2,205,500; <br /> <br />e. Bear all costs of operation, maintenance, and replacement <br />of r<,creation and fish and wildlife areas and facilities, pr<,sent1y <br />estimateJat$142,:SOonanaverageannual basis: the siting and <br />responsibilityfordevelopment,operation,maintenance,andreplac<'Kl<,nt <br /> <br />L; <br /> <br />" <br />