Laserfiche WebLink
<br />3 <br /> <br />This CLOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development and for ensuring all necessary <br />permits required by Federal or State law have been received. State, county, and community officials, <br />based on knowledge of local conditions and in the interest of safety, may set higher standards for <br />construction in the SFHA. If the State, county, or community has adopted more restrictive or <br />comprehensive floodplain management criteria, these criteria take precedence over the minimum NFIP <br />criteria. <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please contact the Consultation Coordination Officer (CCO) for your community. <br />Information on the CCO for your community may be obtained by calling the Director, Mitigation <br />Division of FEMA in Denver, Colorado, at (303) 235-4830. <br /> <br />If you have any questions regarding this CLOMR, please call the FEMA Map Assistance Center, toll <br />free, at 1-877-FEMA MAP (1-877-336-2627). <br /> <br />Sincerely, <br /> <br />~f.~ <br /> <br />Sally P. Magee, Project Engineer <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />For: <br /> <br />Matthew B. Miller, P.E., Chief <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />Enclosures <br /> <br />cc: The Honorable Amy Levek <br />Mayor, Town of Telluride <br /> <br />Mr. Lance McDonald <br />Special Project Manager <br />Town of Telluride <br /> <br />)" <br /> <br />Mr. C. Gary Wolff, P.E, <br />Senior Engineer <br />Mussetter Engineering, Inc. <br />