My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03071
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:14 PM
Creation date
10/4/2006 11:26:20 PM
Metadata
Fields
Template:
Floodplain Documents
County
Summit
Community
Summit County
Stream Name
Blue River
Basin
Colorado Mainstem
Title
LOMR - Affected Panel 080290 0119 C, 080290 0182 C, 080290 0010 - Case No. 95-08-227P
Date
2/8/1996
Prepared For
Summit County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1<" <br /> <br />2 <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Directorate must develop <br /> <br />criteria for floodplain management. For the community to participate in the National Flood Insurance <br /> <br />Program (NFIP), the community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the appropriate flood <br /> <br />insurance premium rates for new buildings and their contents and for the second layer of insurance on <br /> <br />existing buildings and contents, <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days <br /> <br />in which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br /> <br />Directorate reconsider the determination, Any request for reconsideration must be based on knowledge <br /> <br />of changed conditions or new scientific or technical data, All interested parties are on notice that until <br /> <br />the 90-day period elapses, the Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed, <br /> <br />Any person having knowledge or wishing to comment on these changes should immediately notify: <br /> <br />The Honorable Marsha Osborn <br />Chairperson. Summit County <br />Board of Commissioners <br />P,O, Box 68 <br />Breckenridge. Colorado 80424 <br />
The URL can be used to link to this page
Your browser does not support the video tag.