Laserfiche WebLink
<br />'. <br /> <br />3 <br /> <br />Due to present funding constraints, we must limit the number of physical map revisions processed, <br />Consequently, we will not republish the FIRM. FBFM, and FIS report for your community to reflect the <br />modifications described in this LOMR at this time, However, when changes to FIRM Panels 0119 C and <br />0182 C, FBFM Panel 0010, and the FIS report for your community warrant a physical revision and <br />republication in the future, we will incorporate the modifications described in this LOMR at that time. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, <br />the floodway modifications described in this letter, while acceptable to FEMA. must also be acceptable <br />to your community and adopted by appropriate community action, as specified in Paragraph 60,3(d) of <br />the NFIP regulations, <br /> <br />This response to Mr, Pearson's request is based on minimum floodplain management criteria established <br />under the NFIP, Your community is responsible for approving all floodplain development, including this <br />request, and for ensuring that necessary pennits required by Federal or State law have been received, <br />With knowledge of local conditions and in the interest of safety, State and community officials may set <br />higher standards for construction, or may limit development in floodplain areas, If the State of Colorado <br />or your community has adopted more restrictive or comprehensive floodplain management criteria, these <br />criteria take precedence, <br /> <br />The map panels as listed above and as revised by this letter will be used for all flood insurance policies <br />and renewals issued for your community. <br /> <br />This detennination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448),42 U,S,C, 4001- <br />4128, and 44 CFR Part 65, Pursuant to Section 1361 of the National Flood Insurance Act of 1968. as <br />amended, communities participating in the NFIP are required to adopt and enforce floodplain management <br />regulations that meet or exceed minimum NFIP criteria, These criteria are the minimum and do not <br />supersede any State or local requirements of a more stringent nature, This includes adoption of the <br />effective FIRM and FBFM to which the regulations apply and the modifications described in this LOMR, <br />Our records show that your community has met this requirement. <br /> <br />A Consultation Coordination Officer (CCO) has been designated to assist your community, The CCO <br />will be the primary liaison between your community and FEMA, For infonnation regarding your CCO. <br />please contact: <br /> <br />Mr. Steve L. Olsen <br />Director, Mitigation Division <br />Federal Emergency Management Agency, Region VIII <br />Denver Federal Center, Building 710, Box 25267 <br />Denver, Colorado 80225-0267 <br />(303) 235-4830 <br /> <br />\ <br />