My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03064
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:13 PM
Creation date
10/4/2006 11:26:08 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Evaluating Scour at Bridges
Date
11/1/1990
Prepared By
Federal Highway Administration
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />KZ = (100/90)0.13 = 1.01 <br />a' = (1,S70 X 2,8)/ 4,8 = 1091 ft <br />V. = 17,700/(1,870 X 2.8) = 3.38 ft/s <br />Fr = 3.38 / (32.2 X 4,8)0.5 = 0.27 <br />. <br /> <br />Ys/4.8 = 2,27 X 0.55 X 1.01 X (1091/4.8)0.43 X 0.270.6' + 1 <br /> <br />Ys/4,8 = 6.85 <br /> <br />Ys = 32.9 ft <br /> <br />Calculations of scour cepth using the depth of flow in the <br />channel (9,0) gave a scour depth of 25.5 ft. <br /> <br />In appendix B an equation is given for a/y, greater than 25. In <br />this problem a/y, = 1,870/ 6,0 = 312. <br /> <br />Therefore, try the equetion for Case 6 given in Appencix B. <br /> <br />0,33 <br /> <br />Ys- <br />y, <br /> <br />= <br /> <br />4 Fr, <br /> <br />v, = (43,600/(391 X 9,O)} X 1.1 = 13.6 <br />Fr, = 13.E/(32.2 X 9,0)0.50 = 0,80 <br />Y s/ 9 ,0 = 4 ( 0 , 80) 0.33 = 3, 72 <br />Ys = 9.0 X 3.72 = 33.4 ft <br /> <br />. <br /> <br />Comments <br />This is very deep! It could occur if the abutment was out in the <br />main flow. But with the bank of the main channel having trees etc <br />this depth probably will not occur. However, that much flow corning <br />back to the channel ( 17,700 cfs) the scour potential is large. <br />What to do? <br />Use ASSHTO GUIDELINES to design the foundation and set the toe <br />depth for the abutment. with this amount of overbank a ripraped <br />guide bank should be used to protect the abutment. <br />Increasing the width of the bridge opening should be considered. <br /> <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.