My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03064
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:13 PM
Creation date
10/4/2006 11:26:08 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Evaluating Scour at Bridges
Date
11/1/1990
Prepared By
Federal Highway Administration
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />angle of repcse of the bed material commonly assumed to <br />be 30. for sa,d bed stream to get the side slope of the <br />hole, Or use 2,75 y <br />s. <br /> <br />2. Evaluate the Total Scour Deaths, <br /> <br />o Are the scour depths reasonable and consistent with the <br />design engineer's previous experience, with his/her <br />engineering jcdgement? If not, modify the depths to <br />reflect the ergineer's engineering judgement. <br /> <br />o Do the local ~cour holes from the piers or atutments <br />intersect bet~een spans? If so, local scour depths are <br />larger and inceterminant, Therefore, the length of the <br />bridge opening should be reevaluated and the opening <br />increased or the number of piers decreased as necessary. <br /> <br />o Are there other factors (lateral movement of the stream, <br />scour hole arrr.oring, stream flow hydrograph, velocity <br />and discharge distribution, moving of the thalweg, <br />shifting of tte flow direction, channel changes, type of <br />stream, etc.) to be considered? <br /> <br />o Do the calcu12ted scour depths appear too deep for the <br />conditions in the field, relative to the laboratory <br />conditions (Abutment scour equations are for ::,e worst <br />case conditio~s). Would riprap or spur dikes (guide <br />bank) be a more cost effective solution, <br /> <br />o Evaluate cost, safety etc. Also, account :0::: debris <br />affects, <br /> <br />o In the design of bridge foundations, the foundation <br />elevation(s) should te at or below the total scour <br />elevation(s) . <br /> <br />3. Reevaluate the Bridqe Desiqn, <br /> <br />Reevaluate the bridge design on the basis of the foregoing scour <br />analysis. REVISE THE DESIGN AS KECESSARY. This evaluation <br />should consider: <br /> <br />o Is the waterwCLY area large enough; 1. e., is contraction <br />scour too larsre? <br /> <br />o Are the piers too close to each other or to the <br />abutments; i.e., do the scour holes overlap? The top <br />width of a scour hole is about 2.75 times the depth of <br />scour, If scour holes overlap, local scour can be <br />deeper, <br /> <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.