My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03034
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:08 PM
Creation date
10/4/2006 11:24:45 PM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Basin
Arkansas
Title
Floodplain Analysis Report for Fountain Creek Overflow
Date
2/1/1983
Prepared For
Pueblo
Prepared By
MSM Consultants, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />I. <br /> <br />. <br /> <br />Flood Plain Analysis Report <br />For <br />Fountain Creek Overflow <br />Downtown Pueblo <br />Pueblo, Colorado <br />Job No. 5117001 <br />February, 1983 <br /> <br />I. <br /> <br />PURPOSE: <br /> <br />. <br /> <br />The purpose of this report is to document the calculations and <br />present the results of a restudy of the Fountain Creek diversion <br />into downtown Pueblo at the Eighth Street Bridge for the 100-year <br />flood event. This report prepared for the City of Pueblo super- <br />cedes previous diversion calculations developed by the U.S. Army <br />Corps of Engineers (USACOE). <br /> <br />LOCATION OF STUDY <br /> <br />. <br /> <br />This report includes a 100-year floodplain analysis for Fountain <br />Creek at the City of Pueblo, Colorado to determine the flood di- <br />version into the downtown business district for the 100-year <br />flood event. This report includes a detailed study of Fountain <br />Creek from the upstream side of 4th Street to a point approxi- <br />mately 4800' upstream of 8th Street. This report also includes a <br />detailed determination of the 100-year flood diversion into down- <br />town Pueblo and documents the extent of the flooding from the di- <br />version origin at 8th Street to the outlet at Runyen Field. <br /> <br />. <br /> <br />PREVIOUS ANALYSES <br /> <br />. <br /> <br />Several previous studies have been prepared for Fountain Creek at <br />the City of Pueblo, Colorado and address the 100-year diversion <br />into the Downtown Business District. The latest study prepared <br />by the U.S. Army Corps of Engineers in 1977 was proposed to su- <br />percede other previous determinations. <br /> <br />. <br /> <br />Review of the 1977 USACOE calculations show a detailed HEC-2 <br />floodplain analysis of Fountain Creek and hand calculations of <br />the diversion into the downtown area. Utilizing the calculated <br />diversion 100-year flow of 5000 cfs the USACOE developed a HEC-2 <br />model for the downtown area and calculated the diversion flood <br />elevations. According to FEMA Guidelines this downtown flood- <br />plain was calculated to be a 100-year AD zone sheet flooding area <br />with average depth of water from 2-3'. <br /> <br />. <br /> <br />. <br /> <br />During the preparation of the Pueblo Flood Insurance Study Revi- <br />sion by MSM/SP Group, it was observed that questionable coding <br />was found in the USACOE HEC-2 model for Fountain Creek. This <br />questionable coding included the following: <br /> <br />1. Double skew factor for bridge data and single skew for cor- <br />responding ground at the Eight Street Bridge. <br /> <br />. <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.