Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />,Federal Emergency Management Agency <br /> <br />} W~.;;;12 <br />l <br />/ <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.:dO;()g.:357R <br /> <br />" <br />/ <br />The Honorable Elaine Valente <br />Chairperson, Adams COUl{ty <br />, <br />Board of Commissionets <br />450 South Fourth Averlue <br />Brighton, CO 8060 I i <br />, <br /> <br />Community: Adams County, CO <br />Community No.: 080001 <br /> <br />104 <br /> <br />Dear Ms. Valente:,' <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) comment on the <br />effects that a proposed project would have on the effective Flood Insurance Rate Map (FIRM) for Adams <br />County, Colorado and Incorporated Areas, in accordance with Part 65 of the National Flood Insurance <br />Program (NFIP) regulations. In a letter dated August 9,2000, Mr. Sam Sours, Gillans Incorporated, <br />requested that FEMA evaluate the effects that proposed construction of The Haven at York subdivision <br />project along South Wadley Creek would have on the flood hazard information shown on the effective <br />FIRM. The proposed project will include construction of a culvert at York Street, realignment of South <br />Wadley Creek, and channelization from its confluence with Big Dry Creek to the Union Pacific Railroad. <br /> <br />All data required to complete our review of this request for a Conditional Letter of Map Revision <br />(CLOMR) were submitted with letters from Mr. Sours. <br /> <br />We reviewed the submitted data and the data used to prepare the effective FIRM for your community and <br />determined that the proposed project meets the minimum floodplain management criteria of the NFIP. <br />We believe that, if the proposed project is constructed as shown on the plans entitled "South Wadley <br />Creek Channel," prepared by Gillans Incorporated, dated May 17,2000, and the data listed below are <br />received, a revision to the FIRM would be warranted. <br /> <br />Because this request also affects the City of Thornton, a separate CLOMR for that community was issued <br />on the same date as this CLOMR. <br /> <br />The effective FIRM shows South Wadley Creek as a Special Flood Hazard Area (SFHA) designated <br />Zone A, an area that would be inundated by the flood having a I-percent chance of being equaled or <br />exceeded in any given year (base flood), with no Base Flood Elevations (BFEs) determined. <br />Construction of the proposed culvert and channelization project along South Wadley Creek will result in <br />a decrease in the width of the SFHA. The base flood will be contained within the realigned and <br />channelized portion of South Wadley Creek from its confluence with Big Dry Creek to the Union Pacific <br />Railroad. <br />