My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03000
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:02 PM
Creation date
10/4/2006 11:23:40 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Stream Name
South Platte
Basin
South Platte
Title
Water and Related Land Resources Management Study Volume V - Appendix H
Date
7/14/1980
Prepared For
South Platte and Tributaries
Prepared By
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />UPSTREAM DRAINAGE IMPROVEMENTS <br /> <br />A summarized cost estimate for the drainage improvements <br /> <br />upstream from Lowry Air Force Base is shown in table 15. <br /> <br />Table l5 <br />Cost Estimate <br />Upstream Drainage Improvements <br /> <br />First Costs <br /> <br />Direct costs: <br />Dayton Detention Pond <br />Kentucky Drive Drainage System <br />South Dayton Street Drainage System <br />Pond A-B Improvements <br />East Alameda Avenue - Pond A-B Drainage <br />East Alameda Avenue - Storm Drain <br />Fairmont Drive Area Drainage System <br />Contingencies <br /> <br />$ 766,000 <br />l53,OOO <br />513 ,000 <br />132,000 <br />577,000 <br />l58,OOO <br />l52,OOO <br />340,000 <br /> <br />Total Direct Cost <br /> <br />$2,79l,OOO <br /> <br />Indirect costs: <br />Engineering and design <br />Supervision and administration <br /> <br />370,000 <br />l59,OOO <br /> <br />Total First Cost <br /> <br />$3,320,000 <br /> <br />Annual Costs <br /> <br />Interest and amortization ~/ <br />Operation, maintenance, and <br />replacement <br /> <br />$ 237,000 <br />13,000 <br />$ 250,000 <br /> <br />I <br /> <br />Total Annual Cost <br /> <br />~/ laO-year period of analysis at 7.125 percent interest <br /> <br />55 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.