Laserfiche WebLink
<br />. <br /> <br />to Kelly Road Dam. Non-Federal interests would be required to <br /> <br /> <br />provide an additional $1,347,000 which is 20 percent of the costs <br /> <br /> <br />of the potential additional dam on Lowry Air Force Base and the <br /> <br /> <br />proposed modifications to Kelly Road Dam. Authorization for <br /> <br /> <br />construction of the Federal project in accordance with the <br /> <br /> <br />President's proposed cost-sharing policy is recommended. <br /> <br />3 <br /> <br />. <br />