<br />bIBLIOGRAPHY
<br />
<br />I.FcderalIns\lTaneeAdmini"tTation, Flood Hazard Boundarl' ~~
<br />2i Granby, Community No. 080248, effective August 15, 1975.
<br />2. U. S. Geological Survey, 1:24,000 scale map, Granby, 1957
<br />(photorevised 1978).
<br />
<br />3. U. $. Geological Survey, 1:250,00 scale maps, Craig, Denver,
<br />Greeley,audLeadville
<br />
<br />4. Wright Water Engineers, Inc., 2' contour map (undated) from
<br />aerial photos taken by Intrasearch.
<br />
<br />5. Wright Water Engineers, Inc., Silvcrcreek Floo~plain Study,
<br />Fraser River and Tenmile Creek, prepared for Silvcrcreek
<br />Development Company. February, 1984.
<br />
<br />"
<br />
<br />EXHIBIT 1
<br />
<br />
<br />TOWN OF GRANBY
<br />
<br />Phono 13031 B87.37S0
<br />P,O.Bo<17
<br />
<br />Z.fO & Jaopor 51...1.
<br />
<br />Granby,Colorado80448
<br />
<br />November 5, 1985
<br />
<br />11i?IGRi5?\WJiiI
<br />.r IIOCO' . ~
<br />(.'IGS'
<br />" "
<br />COLORAD
<br />CONSEAtIATI~ WATER
<br />NBOARD
<br />
<br />:1r. LarryVlng, Chief
<br />Flood Control and Floodplain Management SectiO::l
<br />Colorado Water Cunservation Boa~d
<br />1313 Sherma~, Room 721
<br />Denver, CO B0203
<br />
<br />',.',
<br />
<br />,\
<br />
<br />Dear Larry:
<br />
<br />I
<br />,
<br />
<br />The To~~ of Granby hereby req~ests the assistance of th~ Colorado Water
<br />Conservation Board in the adoption of a floodplain management progra~.
<br />I have di~c~g~ed various aspects of such a program with several members
<br />of your staff, and the Cranhy Board of Trustees i~ interested in
<br />adopting such a program for the protection Gf the to~'s citizen~.
<br />
<br />I
<br />I
<br />I
<br />I
<br />,
<br />I
<br />,
<br />,
<br />,
<br />,
<br />I
<br />I
<br />I
<br />,
<br />
<br />I believe that yowrstaff has received a copy of the floodplain. stud y
<br />for the rrH~er River and Te::lmile Cr~ek prepared by Wrig~t Water Engineers
<br />in Fobrwary 1984 for tne Silver Creek West ~ubdiv~sion, which was anrrexed
<br />to the town in June ,-9AS. Plea.~~ revi"w tl1e study for nc~q\lacy, as thaL
<br />incorporates Lhemajor floodp<,oneareas <>f the r<>W1l, lw<>uldalsolike
<br />you to a::lalyze the F,ase, River floodpla~~ for some di.tance ~oLh
<br />lLpscream and ,lo~'nstrea", frm<\ Silver Creek. ;;e~t t<> provide Inform;!tion
<br />on ~he areas th~t will likely b~ proposed for annexation in the next
<br />seve.al years, If your funding allow~ for floodplain mappltlS. includir1~
<br />i<!e"tlficntlonof the floo<!'""y, maps would be InOst uneful Lothe town
<br />for the ?ro~ram's impleme"taoion.
<br />
<br />Tha::lkyo\J.for y,,"rassistB:\cein this ",..tter.
<br />
<br />Sincerely,
<br />
<br />tJU~Lt
<br />
<br />Lee D. ~~rk."l
<br />TO'NllManager
<br />
<br />lDM::olia
<br />
<br />xc; Alan 3, Carter, ~ayor
<br />Don Lonnz. Plan"ing C9mrnissi"tlChalr,""n
<br />
|