Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Otero County Paso 6 216/2002 <br /> <br />J. Sc.(lpe of Project: <br />. IDstalI pipe under the westbound lane of mpway 50 to the drain ditch on the north <br />side of the Highway <br />. InstaU catch basin at the north end of the drain diteh <br />. Install pipe from catch basin to east side of Couaty Road 19 <br />. IDstalI pipe under Rocky Ford Ditch <br />. COllltruet curb adjaeent en.tiDg concrete diteh along County Road 19 <br />. Grade ditch to the eontrolled release area <br />. Perform minor repairs to the eDsting to the esiating detention pond <br /> <br />1. Size of Project: This project will help protect 90 properties eoverUlg about a quarter square <br />mile area aDd having market value in esee18 of$3,7 Million. <br /> <br />3, ElltimAte Materials Needed: <br />. 18" RCP (CIP) <br />. 36" RCP (CIP) <br />. 48" RCP (CIP) <br />. lalet Type C (10') <br />. Maabole Slab base (10") <br />. Concrete Curl) <br /> <br />75LF <br />340 LF <br />640 LF <br />1 <br />2 <br />_LV <br /> <br />B. <br /> <br />1. Describe the problem in detail: When local rains of 1.5 inches or more oeear in the watershed <br />above the project area. the esisting drainage system eaJl not carry the water away ill a timely <br />maDDer, thereby causing flooding of the property aDd the roads. <br /> <br />2, Describe how often this problem occurs: l'be areas project will be Dooded one or two of times <br />during a normal year. <br /> <br />3. Does the proposed project merely identifY or analyze the hazards or the problem(s)? No, this will <br />red&<< the frequency of the Dooding. <br /> <br />C. <br /> <br />is the Solution "Independent" or "In Conjunction With"? <br />This project is independent of any other projee1s, but has been planned to work in <br />conjunction with the other improvement projects. <br />When will the project as a whole (include all phasesIparts) be completed? December 31, 2002 <br /> <br />1. <br /> <br />2, <br /> <br />D. Descnbe in detail bow the project reduces hazard effects and risks: By inereasing the capacity of tile <br />draillage system, the water will flow past the presently flooding areas, thereby reducing the risk of <br />Dood damage. It win also reduce the flooding of highways, whieh may end up saving a human Ufe. <br /> <br />PARTS <br />Cost Estimate <br /> <br />A <br /> <br />Specity Cost Breakdown: <br />o <br />566.,000 <br />198,000 <br />o <br />5 164,000 <br /> <br />AppJieant Share: <br />State Share: Ron-federal money <br />Federal Share: <br />Other Non-Federal: <br />Estimated Total Cost: <br />