My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Project No. NH 0504-042 <br />SH 50 at Rocky Ford <br />Construction Subaccount No. 1356] <br /> <br />7/2/01 <br /> <br />REVISION OF SECTION 206 <br />STRUCTURE BAcKFlLL <br /> <br />Section 206 of the Standard Specifications is hereby revised for this project as follows: <br /> <br />Subsection 206.02(a} shall include the following: <br /> <br />At the Contractor's option Structure Backfill (Special) meeting the following gradation requirements may be <br />substituted for Structure Backfill (Class I) or (Class 2) for backfilling culvert pipes, sewer pipes, and minor inlet <br />structures, but not the bridge: <br /> <br />Sieve Desi~nation <br />9.5 mm (3/8 inch) <br />4.75 mm (No.4) <br />2.36 mm (No.8) <br />1.18mm(No.16) <br />300 :m (No. 50) <br />75 :m (No. 200) <br /> <br />% By Weight <br />Passing Square Mile Sieves <br />100 <br />60-90 <br />0-45 <br />0-25 <br />0.6 <br />0.2 <br /> <br />Subsection 206.03 shall include the following: <br /> <br />Compaction of Structure Backfill will not be required if Structure Backfill (Special) is used. <br /> <br />The Contractor may substitute Structure Backfill (Special) for the required embankment material in trench <br />backfilling operations; however, the top I foot shall be the required embankment material. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.