My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Project No. NH 0504-042 <br />SH 50 at Rocky Ford <br />Construction Subaccount No. 13561 <br /> <br />7/2/01 <br /> <br />COMMENCEMENT AND COMPLETION OF WORK <br /> <br />The Contractor shall commence work under the Contract on or before the 20" day following the date of award, <br />unless such time for beginning the work is changed by the Chief Engineer in the "Notice to Proceed". <br /> <br />The Contractor shall complete all work within 60 working days in accordance with the "Notice to Proceed". <br /> <br />Salient features to be shown on the Contractor's progress schedule are: <br /> <br />1. Mobilization <br />2. Storm Sewer Pipe Installation <br />3. Topsoil, Mulching and Seeding <br /> <br />Subsection 108.06 shall include the following: <br /> <br />The Contractor's progress schedule shall be a Critical Path Method Schedule. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.