My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />Darryl L. Schulz - Public Works Director <br />Kenneth S. Parker - Road & Bridge Supervisor <br />Alan Baker - Building Official <br />Charlene Powers - Land Use Planner <br /> <br />s~<- <br /><<"',pO' C00';::' <br /> <br />P.O. Box 511 <br />La Junta, CO 81050 <br />(719) 383-3035 Fax (119) 383-3935 <br /> <br />Departments of Engineering, Land Use and Building <br /> <br />",""- <br />,-~ <br />(;>"\\ <br /> <br />".0, ." <br />,"'u', <br /> <br />April 25,2000 <br /> <br />Colorado Historical Society <br />Attn: Ms. Georgianna Contiguglia <br />1300 Broadway <br />Denver, Co 80203 <br /> <br />Dear Ms. Contiguglia: <br /> <br />Otero County has applied for a Hazard Mitigation Grant to reduce possible flooding in west <br />Otero County. <br /> <br />The proposed project will divert the floodwaters around Manzanola and Rocky Ford. <br /> <br />At Manzanola the water will be placed in the Catlin Canal. At Rocky Ford the water will be <br />placed in the bar ditch on County Road 19 and from there the water will drain into a field which <br />will act as a controlled release pond. <br /> <br />Please review the enclosed documents and respond back to me in writing by May 15, 2000. <br />If! have not heard back from you by May 15, I will assume you have no problems with this <br />project. <br /> <br />If you should have any questions or would like additional information, please feel free to call <br />me. <br /> <br />~~/q <br /> <br /> <br />Otero County Public Works Director <br /> <br />DLS/cep <br /> <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.