My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'."',..",- <br />;;.:.:..0 <br /> <br />. <br /> <br /> <br />DEPARTMENT OF THE ARMY <br /> <br />ALBUQUERQUE DISTRICT, CORPS OF ENGINEERS <br />SOUTHERN COLORADO REGULATORY OFACE <br />720 NORTH MAIN STREET, SUITE 205 <br />PUEBLO, COLORADO 81003.;1046 <br />FAX (719) 543-9475 <br /> <br />_.,'w.....:~RS <br /> <br />REPLY TO <br />A.'TTENllON OF: <br /> <br />April 27, 2000 <br /> <br />Operations Division <br />Regulatory Branch <br /> <br />Mr. Darryl L. Schulz <br />Otero County Department of Public Works <br />P.O. Box 511 <br />La Junta, CO 81050-5011 <br /> <br />Dear Mr. Schulz: <br /> <br />. <br /> <br />This replies to our April 27, 2000, site visit regarding the <br />proposed enlargement of ditches and replacement of culverts <br />adjacent to Catlin Canal and the Rocky Ford Canal in Manzanola <br />and Rocky ford, Otero County, Colorado. We have assigned Action <br />No. 2000 00294 to this activity. <br /> <br />We have evaluated the information you provided and studied <br />the project description, other records, and documents available <br />to us. I visited the site on April 27, 2000. There are no Corps <br />of Engineers' jurisdictional waters on the 3 project sites. <br />Therefore, the project is not regulated under the provisions of <br />Section 404 of the Clean Water Act and a Department of the Army <br />permit will not be required. <br /> <br />This determination will be valid for 2 years from the date of <br />this letter unless new information warrants revision of the <br />determination within that time. <br /> <br />This jurisdictional determination will be valid for 5 years <br />from the date of this letter unless new information warrants <br />revision of the determination within that time. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.