Laserfiche WebLink
<br />Otero County Page 2 'JJ6fJJ:nJ. <br /> <br />2, Size of Project: This project wiD help protect 90 properties covering aboat a quarter square mile <br />. area and having market value in excess of 53.7 MillioD. <br /> <br />, <br />, <br /> <br />3. Estimate Materials Needed: <br /> <br />. lIS" RCi> (CIP) <br />. 36" RCP (CIP) <br />. 48" RCi> (CIP) <br />. Inlet Type C (10') <br />. Manhole Slab base (IOj <br />. Concrete Curb <br /> <br />75 Ll' <br />340 LF <br />640 Ll' <br />I <br />2 <br />500 LF <br /> <br />1, Describe the problem in detail: WIlen local raiDs of 1.5 iDehes or more occur in the watershed above the <br />project area, the existing drainage system can not carry the water away iD a timely maDDer, thereby <br />causing floodiDg aDd damage to area properties aDd the roads. <br /> <br />2, Describe flow often this problem occurs: The area will be flooded ODe or two times a year during a <br />Dormal year. <br /> <br />3. Does the proposed project merely identity or analyze the hazards or the problem(s)? No, this will reduce <br />the frequeacy of the flooding. <br /> <br />.4. When will the project as a whole (include all pbases/parts) be completed? December 31, 200z <br /> <br />5. Describe in detail flow the project reduces hazard effects and risks: By iDcreasing the eapacity of the <br />drainage system, the water will flow past the presently floodiDg areas, thereby reduclag the risk of <br />flood damage. It wiD also reduce the flooding of laigbways, which may end up saviDg humaa lives. <br /> <br />E. Describe how the project reduces hazard effects and risks. This project will iDcrease the capacity of <br />the storm water draiaage system; tlaereby anow the floodwater to flow oat of the preseatly <br />f100diDg areas aDd thea releasiDg It OD a cODtrol1ed basis. This win greatly reduce the frequeney of <br />f100diag these areas. The project will reduce the flooding elevation by at least 8 iDches during a <br />five-year storm event. <br /> <br />Cost Estimate <br /> <br />A. <br /> <br />SpecifY Cost Breakdown: <br />Applicant Share: <br />State Share: non-federal money <br />Federal Share: <br />Other Non-Federal: <br />Estimated Total Cost: <br /> <br />o <br />S 66,000 <br />198,000 <br />o <br />S 264,000 <br /> <br />. <br />