My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Otero County <br />Question 8: <br /> <br />- <br /> <br />Page 16 7J6/2f:1.1l <br /> <br />Describe any potential ef'fects tilt> project may have on lIir qm!lity during or after <br />construction. Also describe how you will reduce or eliminate any damaging impacts <br />during COl1,,'1rU-"tion llIId after completion. <br /> <br />Proposed ProJed: No positive/negative iJIlpact aaticipated. <br /> <br />No-Action: <br /> <br />No positiveIDegative iJIlpact ..ticipated. <br /> <br />Altem<<tlve #2: No positlvelnegative iJIlpad allticipated. <br />Question 9: Describe any dredging and/or disposal of any material (including construction) in any <br />wetJands or waterways, Also describe how you will reduce or eliminate any O/lmaging <br />impacts during construction and after completion. <br /> <br />Proposed ProJed: No positive/ac&ati." iJIlpact andcipated. <br /> <br />Question 10: <br /> <br />- <br /> <br />No-Action: <br /> <br />A/terIuJtlVl! #2: <br /> <br />No positiveIDegative iJIlpact allticipated. <br />No positive/negative impad anticipated. <br /> <br />Describe any modifications of the streambeds or banks of a waterway that may result <br />from this project. Also describe how you will reduce or eliminate- any damaging <br />impacts during construction and after completion, <br /> <br />Proposed Project: No positive/negadve impact anticipated. <br /> <br />No-Action: <br /> <br />AIU!nudlve #2: <br /> <br />No positive/oegative impact alldeipated. <br /> <br />No positivelneptive impact andelpated. <br /> <br />Question 11: Describe any effects that the project will have on any declared Wild and Scenic River <br />or any river being studied for inclusion as a Wild and Scenic River, Also describe how <br />you win reduce or eliminate any dll1N\ging impacts during construction and after <br />completion. <br /> <br />1. Natural Resources <br /> <br />Question 12: <br /> <br />I- <br /> <br />Proposed Project: No posidve/oegative impact anticipated. <br /> <br />No-Action: <br /> <br />AIU!nudlve #2: <br /> <br />No posidve/Ilegadve impact andeipated. <br /> <br />No posidve/negative impact andeipated. <br /> <br />Describe any removal of any marine, aquatic, or terrestrial vegetation. <br /> <br />Proposed ProJed: No positiveIDegative impact anticipated. <br /> <br />No-Action: <br /> <br />AlteflUlthre #2: <br /> <br />No positive/negative iJIlpact anticipated. <br /> <br />No positive/llegative iJIlpact anticipated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.