My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02914
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:49 PM
Creation date
10/4/2006 11:19:55 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Statewide River Rehabilitation and Floodplain Management Needs Inventory
Date
8/18/1997
Prepared For
Colorado DNR
Prepared By
Montgomery Watson
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ITEM IX - PROJECT MANAGEMENT <br /> <br />This section describes our proposed project management system for the Statewide River Reha- <br />bilitation and Floodplain Management Needs Assessment. The outline of this section follows <br />the topics listed in the RFQ. <br /> <br />a. General Organization <br /> <br />The project will be managed by our designated Project Manager, as described in (b) below. He <br />will utilize standard project tracking resources available through Montgomery Watson's Man- <br />agement Information System to compare project expenditures, percent complete, contract bud- <br />get and contract schedule on a monthly basis, or more frequently if necessary. All work will be <br />performed by Denver Regional Office staff. <br /> <br />b. Staffing Roles <br /> <br />The Principal, Mr. Lloyd Gronning, will be responsible for assuring that adequate company <br />resources are available to meet the contract obligations. Mr. Gronning is a Vice President of <br />Montgomery Watson and has authority to commit the staff and financial resources of the firm as <br />necessary to assure a successful project. He will supervise the work of the Project Manager and <br />serve as an alternative point of contact for CWCB on management related issues. <br /> <br />The Project Manager, Mr. Edwin "Chip" Paulson, will be responsible for overall management <br />of technical and administrative details of the project. He will be the main point of contact with <br />Montgomery Watson for CWCB staff, and will work closely with CWCB's project manager <br />throughout the project. He will personally direct the work of all other project team members, <br />and will have primary responsibility for the statewide survey and inventory tasks. He will be <br />responsible for assuring that Montgomery Watson's standard Quality Control procedures are <br />followed. <br /> <br />The Project Engineer, Mr. Steve Lowry, will be responsible for the technical elements of the <br />project, with particular emphasis on flood hazard mitigation measures and costs. <br /> <br />All support staff for report production, graphics, database management, CADD, and other func- <br />tions will be drawn from the resources of the Denver Regional Office. <br /> <br />c. Commitment of Key Personnel and Resources <br /> <br />The key project personnel identified in this Statement of Qualifications can be committed to the <br />project at levels necessary for successful project completion within a six to nine month period. <br />The technical and administrative support staff of the Denver Regional Office are capable of <br />fully meeting the needs of the project over the anticipated timeframe. <br /> <br />18 <br /> <br />MONTGOMERY WATSON ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.