|
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />References
<br />
<br />I. Planning of First Creek. Irondale Gulch and DF A 0055 Outfall Systems, Hydrology Report, UDFCD,
<br />Adams County, City and County of Denver, City of Aurora, City of Commerce City, City of Brighton,
<br />Wright Water Engineers Inc., April 1988.
<br />2. 7 County Denver Region, Landiscor Aerial Infomlation, 1998-99.
<br />3. Belle Creek Filing No.1, Final Drainage Study, Icon Engineering, Inc., Revised July 2000.
<br />4. Urban Storm Drainage Criteria Manual Volume I, Wright McLaughlin Enginecrs, March 1969.
<br />5. City of Aurora Proposed Annexation Area Drainage Master Plan, Baseline Hydrology Report, Simons
<br />Li & Associates Inc., August 1985.
<br />6. First Creek and DF A 0055 Outfall Systems Master Plan, Preliminary Design Report, UDFCD, Adams
<br />County, City and County of Denver, City of Aurora, City of Commerce City, City of Brighton, Wright
<br />Water Engineers Inc., February 1990.
<br />7. Revision to The First Creek and DFA 0055 Outfall Systems Master Plan, (Picadilly Road to Buckley
<br />Road) Final Report, UDFCD, Gateway Regional Metropolitan District, MartinlMartin Inc., Novembcr
<br />1998.
<br />8. Major Drainage Planning First Creek Phase B Volume 1, UDFCD, City of Aurora, Arapahoe County,
<br />Adams County, Engineering Consultants Inc. March 1977.
<br />9. Major Drainage Planning First Creek Phase B Volume 2, UDFCD, City of Aurora, Arapahoe County,
<br />Adams County, Engineering Consultants Inc. March 1977.
<br />10. Review of First Creek and Tributary T SWMM, UDFCD, Taggart Engineering Associates, Inc. May
<br />1998.
<br />II. Bald Eagle Shallows Flood Storage and Ecosystems Improvements, UDFCD, Taggart Engineering
<br />Associates, Inc., October 1996.
<br />12. Flood Insurance Study, Adams County. Colorado and Incorporated Areas, Fcdcral Emergency
<br />Management Agency, August 16, 1995.
<br />13. Soil Survey for Adams County, U.S. Department of Agriculture, Soil Conservation Servicc, October
<br />1974.
<br />14. Soil Survey for Arapahoe County, U.S. Department of Agriculture, Soil Conservation Service, October
<br />1974.
<br />15. Comprehensive Land U<e, Existing, Public Works, Commerce City, July 1999.
<br />16. Comprehensive Land Use, Future, Public Works, Commerce City.
<br />17. Comprehensive Land Use, Existing. Public Works, Adams County, January 1999.
<br />18. Comprehensive Land Use, Future, Public Works, Adams County, January 1999.
<br />19. Urban Drainage Storm water Management Model (UDSWM95), Urban Drainage and Flood Control,
<br />Reviscd 1998 University of Colorado.
<br />20. Colorado Urban Hydrograph Procedure Computer Model (CUHPEPC), Urban Drainage and Flood
<br />Control District, Revised 1987.
<br />21. Colorado Urban Hydrograph Procedure Computer Model (CUHPF95), Urban Drainage and Flood
<br />Control District, Revised September 10, 1998.
<br />22. First Creek and DFA 0055 Outfall Systems Master Plan, Alternatives Report, UDFCD, Adams County,
<br />City ofCommcrce City, Turner Collie & Braden Inc., November 2000.
<br />
<br />23. First Creek and DF A 0055 Outfall Systems Master Plan, Draft Flood Hazard Area Delineation Report,
<br />UDFCD, Adams County, City ofCommercc City, Turner Collie & Braden Inc., February 2002.
<br />24. First Creek and DF A 0055 Outfall Systems Master Plan. Hydrology Report, UDFCD, Adams County,
<br />City of Commerce City, Turner Collie & Braden Inc., Fcbruary 2000.
<br />25. Internal Memorandum: Preliminary Investigation of Maul Reservoir, Turner Collie & Braden Inc.,
<br />Scptember 2001.
<br />23. Wetland Assessment First Creek Watershed. ERO Resources Corporation, February 2000.
<br />
<br />- 40-
<br />
|