Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />\1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />submittal of the Phase [ Alternatives Report. A complete listing of meeting agendas and minutes can <br />be found in Appendix A. <br /> <br />8. <br /> <br />E. <br /> <br />SUMMARY OF DATA OBTAINED <br /> <br />9. <br /> <br />Thc project sponsors provided information for the study, which included 2-foot contour mapping of <br />Adams County and Commerce City. The basis of control for this mapping is as follows: <br /> <br />Horizontal Control <br />Type: Modified State Plane Coordinates (USFT) <br />Basis: Colorado High Accuracy Reference Network <br />Datum: North Amcrican Datum (NAD) 83-92 Modified <br />State Plane Zone: Colorado Central Zone (502) <br />Vertical Control <br />Datum: North American Vertical Datum of 1988 (NA VD 88) <br /> <br />GIS infonnation was also provided including roads, streams, topography, existing land use, and <br />proposed land use. The RMA provided 2-foot contour mapping of their site with a horizontal datum <br />ofNAD 27 and a vcrtical datum ofNGVD 29. In addition, USGS 1 :24,000 quadrangle maps were <br />obtained for the First Creek watershed. Landiscor aerial photography was also obtained. <br /> <br />F. <br /> <br />PREVIOUS STUDIES <br /> <br />Several studies have becn conductcd for the First Creek watershed. The hydrology contained in this <br />study will supcrsedc that for the First Creek watershed contained in the previous reports listed as I, <br />2, 3 and 4, below. The drainage improvcments presented will supersede those for the lower First <br />Creek watershed that were presented in the previous report listed as 3, below. <br /> <br />These studies are sununarized as follows: <br />1. City of Aurora Proposed Annexation Area Drainage Master Plan, Baseline Hydrology <br />Report, Simons Li & Associatcs Inc., August 1985, (Reference 5). <br />2. Planning of First Creek, Irondale Gulch and DF A 0055 Outfall Systems, Hydrology Report, <br />UDFCD, Adams County, City and County of Denver, City of Aurora, City of Commerce <br />City, City of Brighton, Wright Water Engineers Inc., April 1988, (Reference 1). <br />3. First Creek and DFA 0055 Outfall Systems Master Plan, Preliminary Design Report, <br />UDFCD, Adams County, City and County of Denver, City of Aurora, City of Commerce <br />City, City of Brighton, Wright Water Enginecrs Inc., February 1990, (Reference 6). <br />4. Revision to The First Creek and DFA 0055 Outfall Systems Master Plan, (Picadilly Road to <br />Buckley Road) Final Report, UDFCD, Gateway Regional Metropolitan District, <br />MartinlMartin Inc., November 1998, (Refcrence 7). <br />5. Major Drainage Planning First Creek Phase B Volume 1, UDFCD, City of Aurora, <br />Arapahoe County, Adams County, Engineering Consultants Inc. March 1977, (Refcrence 8). <br />6. Major Drainage Planning First Creek Phase B Volume 2, UDFCD, City of Aurora, <br />Arapahoe County, Adams County, Engineering Consultants Inc. March 1977, (Reference 9). <br /> <br />7. <br /> <br />Review of First Creek and Tributary T SWMM, UDFCD, Taggart Engineering Associates, <br />Inc. May 1998 (Reference 10). <br />Bald Eagle Shallows Flood Storage and Ecosystem Improvements, UDFCD, Taggart <br />Engineering Associates, Inc. October 1996 (Reference II). <br />Flood Insurance Study, Adams County, Colorado and Incorporated Areas, Federal <br />Emergency Management Agency, August 16, 1995 (Reference 12). <br />Lower First Creek and DF A 0055 Hydrology Report, UOFCD, Adams County, Commerce <br />City, Turncr Collie & Braden Inc., February 2000, (Reference 24). <br /> <br />10. <br /> <br />-3 - <br />