Laserfiche WebLink
<br />N <br />o <br />N <br />~ <br />o <br />;; <br /> <br />a <br />. <br />. <br />.. <br />~ <br />g <br />~ <br />, <br />t <br />< <br />. <br />< <br />8 <br />/ <br />~ <br />~ <br />U <br />/ <br />~ <br />D <br />.. <br />< <br />~ <br />6 <br />~ <br />~ <br />~ <br />;: <br /> <br />I <br /> <br />I <br /> <br />COMMENTARY SHEET 3 OF 23 <br /> <br />PRELIMINARY DESIGN COST ESTIMATE SHEET 3 OF 23 <br /> <br />I <br /> <br />DRAlNAGEWAY; LOWER FIRST CREEK <br /> <br />STATIONS; 38+00 TO 66+00 <br /> <br />ORAINAGEWAY; LOWER FIRST CREEK <br /> <br />100-YEAR FLOW RANGE; 4,443 CFS FROM 38+00 TO 57+50; 4,180 CFS FROM 57+50 TO 66+00 <br /> <br />I <br /> <br />IMPROVEMENT <br /> <br />QUANTITY <br /> <br />UNIT <br /> <br />UNIT COST <br /> <br />TOTAL COST <br /> <br />PROPOSED CONDITIONS; <br /> <br />THE IMPROVEMENTS ARE DESIGNED FOR PEAK FLOOD Fl.OW RATES BASEO ON FUTURE DEVELOPMENT, A 100-YEAR <br />RECURRENCE PERIOD, AND MASTER PLANNED REGIONAL DETENTION IN THE UPPER WA TERSHED, <br /> <br />IMPROVEMENTS FROM STATION 38+00 TO 57+50 ON THIS SHEET WILL BE ADMINISTERED BY DI\o1SION OF MINERALS <br />AND GEOLOGY THROUGH AN EXISTING RECLAMATION PERMIT, <br /> <br />IMPROVEMENTS INCLUDE A GRASS-LINED CHANNEL FROM STATION 57+50 TO STATION 62+00. <br /> <br />IMPROVEMENTS FOR THIS SHEET WILL REQUIRE AT LEAST A 215 FOOT RIGHT-OF-WAY, <br /> <br />LOW Fl.OW CHANNEL IMPROVEMENTS SHALL INCLUOE RIPRAP ALONG THE SIDE SLOPES, <br /> <br />IMPROVEMENTS FOR THIS SHEET SHALL REQUIRE SEVEN 10'X6' RCBC 52 FEET IN LENGTH UNDERNEATH BRIGHTON <br />ROAD AT THE INTERSECTION OF FIRST CREEK. <br /> <br />NATIVE GRASSES SHALL BE PLANTED THROUGHOUT THE IMPROVED AREA TO PREVENT EROSION. <br /> <br />EARTHWORK (CUT) 1,567 <br />EARTHWORK (FILL) 14,282 <br />MULTIPURPOSE TRAIL (12' WIDE) 450 <br />NATIVE SEEDING AND MULCHING 2,1 <br />7 - lO'X6' CBC (BRIGHTON ROAD) 52 <br />RIPRAP FOR LOW Fl.OW CHANNEL 42D <br />RIGHT-OF-WAY 99,330 <br />OUTfALL RIPRAP 1 <br /> <br />$6,00 <br />$8,00 <br />$25,00 <br />$2,DOO.00 <br />$4,900,00 <br />$50,00 <br />$1.00 <br />$10,000,00 <br /> <br />I <br /> <br />$9,402.00 <br />$114,256,00 <br />$11,250,00 <br />$4,240,00 <br />$254,800.00 <br />$21,000.00 <br />$99,330.00 <br />$10,000.00 <br /> <br />CY <br />CY <br />LF <br />ACRE <br />LF <br />CY <br />SF <br />LS <br /> <br />I <br /> <br />I <br /> <br />$524,278.00 <br />$246,411,00 <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST <br />47:>,; LEGAL, ADMIN" ENGINEERING, UTILITY ADJUSTMENTS & CONTINGENCIES <br /> <br />I <br /> <br />$770,689,00 <br /> <br />I <br /> <br />TOTAL ESTIMATED COST <br /> <br />IMPROVEMENTS INCLUDE 4S0 LINEAR FEET OF A 12 FOOT WIDE MULTIPURPOSE TRAIL <br /> <br />OUTfALL RIPRAP WLL BE NEEDED FOR THE BOX CULVERT AT BRIGHTON ROAD <br /> <br />I <br /> <br />PROBLEMS ENCOUNTfRFD ON THIS SHFFT' <br /> <br />POSSIBlE NEED FOR RELOCATING PRIVATE UTILITIES AND ROADS, <br /> <br />BRIGHTON ROAD MAY NEED TO BE ELEVATED NEAR THE INTERSECTION OF FIRST CREEK TO ACCOMMOOA TE THE <br />loo-YEAR EVENT Fl.OW, <br /> <br />AREAS REQUIRING FILL TO ACHIEVE THE DESIRED TOP-OF-BANK WILL ALSO REQUIRE GRADING OF THE ADJACENT <br />LAND, <br /> <br />MULTIPLE BUILDINGS MAY NEED TO BE RELOCATED OR CONDEMNED, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />