Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I' <br /> <br /> <br />------- <br />/ 15 / <br />@------@) <br /> <br />Flood outline of July 31, - August 1, 1976 <br />Site of peak discharge determination <br />(number is same as in t~ble 1 ) <br />Highwater elevations and cross. sections <br />(data shown in table 2) . <br /> <br />Approximate scale,1 inch = 400 feet <br /> <br />BIG THOMPSON RIVER FLOOD of <br /> <br />JULY 31,--AUGUST 1,1976 <br /> <br />PLATE <br /> <br />63 <br /> <br />NO. <br /> <br />51 <br />