Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.' <br />I <br />I <br /> <br /> <br />-------- <br />/ 15 / <br />~ <br /> <br />Flood outline of July 31,- August 1, 1976 <br />Site of peak discharge determination <br />(number is same as in table 1) <br />Highwater elevations and cross. sections <br />(data shown in table 2) <br /> <br />Approximate scale,1 inch = 400 feet <br /> <br />BIG THOMPSON RIVER FLOOD of <br /> <br />JULY 31,--AUGUST 1. 1976 <br /> <br />PLATE <br /> <br />61 <br /> <br />NO. <br /> <br />49 <br />