Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br />/ 15 / <br />~ <br /> <br />39 <br /> <br /> <br />EXPLANATION <br /> <br />Flood outline of July 31, - August 1, 1976 <br />Site of peak discharge determination <br />(number is same as in table 1) <br />Highwater elevations and cross. sections <br />(data shown in table 2) <br /> <br />Approximate scale,1 inch = 200 feet <br /> <br />BIG <br /> <br />FLOOD of <br /> <br />27 <br /> <br />THOMPSON <br /> <br />RIVER <br /> <br />JULY 31.--AlJGlST 1,1976 <br /> <br />PLATE <br /> <br />NO. <br />