Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />1. Introduction <br /> <br />The Applied Weather Associates (A W A) team has completed a site-specific <br />Probable Maximum Precipitation (PMP) study for the Cherry Creek drainage basin and a <br />technical review of the 1995 National Weather Service (NWS) titled "Site-Specific PMP <br />for the Cherry Creek Drainage in Colorado". The A W A team members were as follows: <br /> <br />Applied Weather Associates <br /> <br />Dr, Ed Tomlinson <br />Mr. Ross Williams <br />Mr. John Henz <br />Mr. Doug Trieste <br />Mr. Dan Dansereau <br /> <br />HDR Engineering <br />Flow Technologies <br />GeoClim Consulting Group <br /> <br />1.1 Background <br /> <br />The NWS completed a site-specific PMP study for the US Army Corps of <br />Engineers (U8ACE) in July 1995. The results from that study were used by the USACE <br />to compute the Probable Maximum Flood (PMF). During public hearings related to <br />modifications ofthe Cherry Creek dam for reservoir and dam safety issues, concern was <br />expressed over assumptions and procedures used in the NWS study. Subsequently, the <br />Colorado Water Conservation Board (CWCB) in cooperation with Greenwood Village, <br />Aurora, Arapahoe County and Douglas County provided funding to conduct an <br />independent site-specific PMP study for the Cherry Creek drainage basin, A Fact Sheet <br />for the Cherry Creek Reservoir is provided by the CWCB in Appendix A. The Scope of <br />Services is provided in Appendix B. The study was reviewed by a Technical Review <br />Panel (TRP) and a Project Advisory Committee (PAC). Members of the TRP are listed <br />below and members of the PAC are listed in Appendix C. <br /> <br />Mr. Lou Schreiner <br />Mr. Nolan Doesken <br />Mr. Gary Lewis <br /> <br />Bureau of Reclamation, Denver, Colorado <br />Colorado Climate Center, Fort Collins, Colorado <br />Parsons Engineering, Denver, Colorado <br /> <br />1.2 Project Overview <br /> <br />The project consisted of 13 tasks, The Scope of Services for these tasks is <br />provided in Appendix B. Some of the tasks addressed reviewing the 1995 NWS Site- <br />Specific Study (NWSSSS) for the Cherry Creek drainage and verifYing the NWS <br />procedures and calculations. Other tasks were related to conducting an independent site- <br />specific PMP study and comparing the A W A team approach with the NWS approach. <br />Two interim reports were produced - Interim Report #1 in April, 2002 and Interim Report <br />#2 in June, 2002, These were reviewed by the TRC and NWS. Periodic review meetings <br />were held with the TRP and PAC to review progress on the study. <br /> <br />I <br />