My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02837
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:37 PM
Creation date
10/4/2006 11:12:55 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Stream Name
Buffalo Creek
Basin
South Platte
Title
Buffalo Creek Mitigation Plan Project Notebook
Date
6/11/1998
Floodplain - Doc Type
Flood Documentation Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Oct-29-96 10:51 HENZ METEOROLOGICAL SRVC. 303-458-5309 <br /> <br />P.04 <br /> <br />'. <br /> <br />HMS will prepare a final report which presents a description of the <br />meteorological sub-cloud and cloud layer weather factors which produced the <br />event, storm-tracks of the storm's radar echo movement/coverage across the <br />basins and figures of the time distribution and intensity of the associated rainfall. <br /> <br />The cost of each re-constitution varies by the amount of radar data which will be <br />analyzed for each of the three event dates. The table matrix of costs below <br />identifies the cost for each event and the number of hours of radar data <br />analyzed. Please note that a lower cost per event cost is offered for the election <br />of re-constitution of all three events. The costs of the individual events reflect <br />the number of - 6-minute radar-rainfall periods involved and basin radar echo <br />coverage factors which varied considerably with each event. <br /> <br />Cost matrix table for event rainfall re-constitution <br /> <br />. <br /> <br /> <br />2.5 hours <br />-5.5 hours <br />-4.5 hours <br />7 1.1 hr.) and 8(1,5 hr.) <br />-3 hours <br />2.0 hours <br />All six events <br /> <br />$2 5 <br />3,000 <br />\ 4 500 <br />$1,500 <br />$2,000 <br />$2,125 <br />$12,500{ 15% discount <br /> <br />HMS will deliver the re-constitution of the rainfall within 45 days or sooner of <br />notice to proceed, HMS requests that the purchase order be for a firm fixed <br />contract cost payable in two installments based on completed work relative to <br />HMS and funding agency billing cycles. <br /> <br />Thank you for considering HMS for this valuable re-constitution work. We <br />believe that it will provide an important contribution to the understanding of the <br />flash flooding of the fire-ravaged Buffalo Creek basins. Additionally it will provide <br />new insight into the link between flash flooding events and rainfall and <br />subsequent runoff in areas affected by forest fires which could prove to be useful <br />throughout the Western United States. <br /> <br />Sincerely yours, <br /> <br />. ~!.:~ <br /> <br />President, C~C() No. 270 <br />
The URL can be used to link to this page
Your browser does not support the video tag.