My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02755
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:22 PM
Creation date
10/4/2006 11:08:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Golden
Stream Name
Ralston Creek
Basin
South Platte
Title
HEC-2 Run for Schwarzalder Mine Study
Date
2/19/1982
Prepared For
Cotter Corporation
Prepared By
McDermid Engineering
Floodplain - Doc Type
Data (general)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Cooperative Venture: Completion time = 2 years. <br /> Platte River (contract) = $1,680,000. <br /> Tributaries (County) = 330,534. <br /> Equipment costs (federal) = 609,800. <br /> Maintenance costs (10 yrs.) = 442,800. <br /> Total = $3,063,134. <br /> <br />t <br /> <br />Conclusion: <br /> <br />1. The program, as outlined, is necessary and feasible. <br /> <br />2. Any method chosen would be financially sound and workable. <br /> <br />3. The plan would fit the outline of the Five County Flood Control <br />Commission and would serve until the Corps of Engineers pro- <br />posals are instituted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.