Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />SECTION 1 INTRODUCTION <br /> <br />I. I Purpose "...,.".,.".,.",....."."",."."",.".,."".,.."".,..",."...""".,.",.,.,.",.,.,1 <br />1.2 Project Location and Background .......................................,...,.......,.... I <br />1.3 Data Collection and Filed Investigation .............,.......................,.,....... I <br /> <br />SECTION 2 HYDROLOGY <br /> <br />2, I Flood Hydrology ".,..",.........",...,..."..,.,...".....""."....""..,.",.,."'.,....,,., 5 <br />2,1,1 Gage Records..................,....,..............................................,5 <br />2. 1.2 Flood Frequency Analysis .........,.......,............,....................5 <br />2.2 Watershed Hydrology Investigation....,................................................5 <br />2.2,1 Drainage Basin..................,.........,..............................,........,5 <br />2,2,2 Steamboat Lake ..........................................,..............,.........8 <br />2.2.3 Travel Time Issues................,................................,.,.......,...9 <br />2.2.4 Other Watershed Factors ..,...................,............................12 <br /> <br />SECTION 3 HYDRAULIC ANALYSIS <br /> <br />3,1 Purpose ...".....,....,...."",.,..,."",..,...",.,...."'...'",,.....,."",.,.."...."...,.",.13 <br />3 ,2 Methodology .",...".,..'"'..,....."'...,..','..,....,,,....,,,'..,.,...",..,.",.,.",.,.,..,,13 <br />3.3 Flows to the West Fork of the Elk River ............................................ I3 <br />3.4 Model Calibration...,...................................................................,....... 17 <br />3,5 Superelevation Analysis ."..".",'...,..,'.',."."".... "".,..".""....".".',."., ,,22 <br /> <br />SECTION 4 CHANNEL STABILITY <br /> <br />4.1 General",., ".".""...",."",."".."."", ".", "".,."".." "",.,.", ""."."", ".", ",23 <br />4.2 Bed and Bank Material Composition ....,..................................,.........24 <br /> <br />4,3 Geomorphic Analysis "."."",..,.""..,."."" ".""..,..",.,...,..",...",.,...",.,.24 <br />4.3,1 Purpose and Data ........................................,....,.............,...24 <br />4.3,2 Geologic Setting ....................,...............,.....,............,........24 <br />4.3.3 Geomorphic Setting and Historical Analysis ..,........,........25 <br />4.3 ,4 Comparative Analysis"" ".".",.".""."..", "..""".., "".,..""..28 <br /> <br />4.3.5 Bank Instability.""....."".,."""",."",.,.""",.".",..,."....."".. 2 8 <br />4,3.6 Conclusions.......,'" ...""".,..,.",.".""",.""",.".",.."""...""., 2 8 <br /> <br />SECTION 5 ALTERNATIVE ANALYSIS <br /> <br />5,1 General"",.".".,.",., "",.,."."", '" "",.".,."" "."",.,.""." "" "" '" ",.,.,.",.,.29 <br />5,2 Conceptual Alternative Analysis ....,..,...,............................,.............,.29 <br /> <br />5,2,1 Constraints ..,..........,....,.........,..,....,..,..........,..........,.......,..,29 <br />5 ,2,2 Assumptions """,."."".".'" "'.',."".,,, "".,."""" '" ",.,.".".,., 30 <br />5,2,3 Bed Stability Measures..................................,.........,........,30 <br />5,2.4 Bank Stability Measures...,..,.............................................33 <br />5.2,5 Range of Alternatives ..,.........,............,......................,...,...35 <br />5,2,6 Cost Estimates .........,........,.........,..................,.....,.....,.,.....39 <br /> <br />5.3 Recommendations",."..".",.,..""..".""" "."".",. """ ",;"", ".", ".",.",." 39 <br />