Laserfiche WebLink
<br />'3 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br /> Existing BFE Modified BFE <br />Location (feet)* (feet)* <br />At corporate limits 4,637 4,635 <br />Approximately 450 feet downstream of <br />u.s. Highway 85 4,638 4,636 <br />Just upstream of u.s. Highway 85 4,638 4,637 <br />North of 8th Street and east of <br />u.s. Highway 85 4,638 2/; <br />Approximately 800 feet downstream <br />of 5th Street 4,640 4,638 <br />Approximately 500 feet downstream of <br />5th Street 4,640 4,639 <br />Just downstream of 5th Street 4,641 4,640 <br />Just upstream of 5th Street 4,641 4,641 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest <br />whole foot <br />#Depth in feet above ground <br /> <br />Public notification of the proposed modified BFEs will be given. in the <br />Gree1ev Daily Tribune on or about December 21 and December 28, 1994. A copy <br />of this notification is enclosed. In addition, a notice of changes will be <br />published in the Federal Register. <br /> <br />Because this Lo.MR will not be printed and distributed to primary users, such <br />as local insurance agents and mortgage lenders, your community will serve as <br />a repository for these new data. We encourage you to disseminate the <br />information reflected by this Lo.MR throughout the community, so that <br />interested persons, such as property owners, local insurance agents, and <br />mortgage lenders, may benefit from the information. We also encourage you to <br />prepare a related article for publication in your community's local <br />newspaper. This article should describe the assistance that officials of <br />your community will give to interested persons by providing these data and <br />interpreting the NFIP maps. <br /> <br />The revisions are effective as of the date of this letter; however, within <br />90 days of the second publication in the Greeley Daily Tribune, a citizen may <br />request that the Federal Emergency Management Agency (FEMA) reconsider the <br />determination made by this Lo.MR. Any request for reconsideration must be <br />based on scientific or technical data. All interested parties are on notice <br />that, until the 90-day period elapses, the determination to modify the BFEs <br />presented in this Lo.MR may itself be modified. <br /> <br />Due to present funding constraints, FEMA must limit the number of physical <br />map revisions processed. Consequently, we will not republish the FIRM and <br />FBFM for your community to reflect the determination of this Lo.MR at this <br />time. However, when changes to FIRM Panel 0002 B, FBFM Panel 0002 B, and the <br />FIS report for your community warrant a physical revision and republication <br />in the future, the determination in this LOMR will be incorporated at that <br />time. <br />